AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 29 of 46  ELOG logo
  ID Date Author Subject Text Attachments
  359   Wed Sep 7 16:11:25 2016 Patrick Coleman-SmithUpdated layout.txt file in aidas1Used the layout reported in ELOG357 and
updated the layout.txt file used in the "Layout
and Status" browser window.
  
  358   Mon Sep 5 06:54:02 2016 TDMonday 5 September14.20 R17 continues

      DSSSD bias/leakage current OK - see
 16x 
  357   Sun Sep 4 04:35:42 2016 TDFEE64 & MACB configuration

 IMG_6502.JPGIMG_6503.JPGIMG_6504.JPG 
  356   Sun Sep 4 04:26:23 2016 TDSunday 4 September14.20 R13 continues

      DSSSD bias/leakage current OK - see
 20x 
  355   Sat Sep 3 05:54:14 2016 TDSaturday 3 September14.20 R13 continues

      DSSSD bias/leakage current OK - see
 16x 
  354   Fri Sep 2 06:22:26 2016 TDFriday 2 September14.20 R11 continues

      DSSSD bias/leakage current OK - see
 17x 
  353   Thu Sep 1 03:45:34 2016 TDThursday 1 September13.33 R11 starts

      ASIC settings 2016Aug20-15.34.53
 28x 
  352   Tue Aug 30 08:26:33 2016 TDTuesday 30 August16.18 R10 stops

      ASIC settings 2016Aug20-15.34.53
 28x 
  351   Mon Aug 29 08:53:55 2016 TDnnaida19 restored
nnaida19 restored to configuration - /MIDAS/Aida/tclhttpd/aidas1/startup.tcl
- see attachment 1
 startup.tcl 
  350   Mon Aug 29 06:57:32 2016 TDMonday 29 August
Per the instructions provided by https://elog.ph.ed.ac.uk/AIDA/331
added Servisol Heat Sink Compound
 7x 
  349   Fri Aug 26 02:10:31 2016 TDFriday 26 August10.11 R9 continues

      ASIC settings 2016Aug20-15.34.53
 28x 
  348   Thu Aug 25 02:10:10 2016 TDThursday 25 August11.40 R9 continues

      ASIC settings 2016Aug20-15.34.53
 21x 
  347   Wed Aug 24 03:43:44 2016 TDWednesday 24 August11.40 R8 continues

      B2F/FF temp +25 deg C, d.p. +14 deg
 32x 
  346   Tue Aug 23 01:49:01 2016 TDTuesday 23 August
09.50 DAQ found stopped
      No error messages merge/tapeserver
 18x 
  344   Mon Aug 22 13:37:30 2016 TDMonday 20 August> 11.00 Restore power to AIDA following Saturday's
shutdoen in preparation for the planned maintenance
>       outage on Sunday.
  
  343   Mon Aug 22 11:45:07 2016 Patrick Coleman-SmithSoftware updated in AidaLogged into aidas1, installed AidaExecV8
with a test of the time difference between
SYNC data items. Failure to be 0x40000 clocks
  
  342   Mon Aug 22 10:35:31 2016 TDMonday 20 August11.00 Restore power to AIDA following Saturday's
shutdoen in preparation for the planned maintenance
      outage on Sunday.
 17x 
  341   Mon Aug 22 10:35:06 2016 TDSaturday 20 August    
  340   Fri Aug 19 12:41:43 2016 TD, VP, reply PJCSFriday 19 August> > > 
> > > 14.00 Both AIDA NIM bins U/S 
> > >       Upper NIM bin - BNC PB-4, Ortec
  
  339   Fri Aug 19 11:07:44 2016 TD, VP, reply PJCSFriday 19 August> > 
> > 14.00 Both AIDA NIM bins U/S 
> >       Upper NIM bin - BNC PB-4, Ortec
 7.png 
ELOG V3.1.4-unknown