AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 346     Entry time: Tue Aug 23 01:49:01 2016
Author: TD 
Subject: Tuesday 23 August 
09.50 DAQ found stopped
      No error messages merge/tapeserver - see attachments 1-2
      Most recent data file R7_107 last written to 08.13 23.8.16

10.00 Electrical power to AIDA is off for reasons unknown (power saving/maintenance/trip)
      3-ph circuit to Julabo FL1106 recirculating chiller is unaffected

10.20 Analysis of R7_107 (most recent data file) shows data synchronised OK 

11.30 Yoshida-san informs us that the experimental power to F11 is off for annual inspection/maintenance.
      Power should be restored this evening, or possibly, sometime tomorrow.

19.00 Power restored

      FEE64 power *off* - as expected following power outage
      Detector bias *off* - as expected following power outage

      Startup AIDA
      System wide checks, FEE64 temperatures and DSSSD bias/leakage currents - see attachments 3-11

19.24 R8 starts

      slow comparator 0x10
      LEC/MEC fast comparator 0xff

      ASIC settings 2016Aug20-15.34.53
      Discriminator masks -> 0x0

      BNC PB-4 Pulser
      Amplitude 90,000
      x5 attenuator IN
      t_r 50ns tau_d 50us 
      - polarity
      INT ref, delay MIN, tail pulse

19.31 AIDA SYNC, PAUSE, RESUME, SYNCtime warp, Good data etc statistics - see attachments 12-18
Attachment 1: 60.png  286 kB  Uploaded Tue Aug 23 02:50:31 2016  | Hide | Hide all
60.png
Attachment 2: 61.png  104 kB  Uploaded Tue Aug 23 02:51:05 2016  | Hide | Hide all
61.png
Attachment 3: 70.png  156 kB  Uploaded Tue Aug 23 12:26:53 2016  | Hide | Hide all
70.png
Attachment 4: 71.png  154 kB  Uploaded Tue Aug 23 12:27:06 2016  | Hide | Hide all
71.png
Attachment 5: 72.png  153 kB  Uploaded Tue Aug 23 12:27:18 2016  | Hide | Hide all
72.png
Attachment 6: 73.png  153 kB  Uploaded Tue Aug 23 12:27:30 2016  | Hide | Hide all
73.png
Attachment 7: 74.png  220 kB  Uploaded Tue Aug 23 12:27:45 2016  | Hide | Hide all
74.png
Attachment 8: 75.png  185 kB  Uploaded Tue Aug 23 12:27:57 2016  | Hide | Hide all
75.png
Attachment 9: 76.png  133 kB  Uploaded Tue Aug 23 12:28:08 2016  | Hide | Hide all
76.png
Attachment 10: 77.png  12 kB  Uploaded Tue Aug 23 12:28:23 2016  | Hide | Hide all
77.png
Attachment 11: 78.png  12 kB  Uploaded Tue Aug 23 12:28:34 2016  | Hide | Hide all
78.png
Attachment 12: 80.png  87 kB  Uploaded Tue Aug 23 12:35:19 2016  | Hide | Hide all
80.png
Attachment 13: 81.png  81 kB  Uploaded Tue Aug 23 12:35:31 2016  | Hide | Hide all
81.png
Attachment 14: 82.png  82 kB  Uploaded Tue Aug 23 12:35:42 2016  | Hide | Hide all
82.png
Attachment 15: 83.png  82 kB  Uploaded Tue Aug 23 12:35:53 2016  | Hide | Hide all
83.png
Attachment 16: 84.png  84 kB  Uploaded Tue Aug 23 12:36:09 2016  | Hide | Hide all
84.png
Attachment 17: 85.png  90 kB  Uploaded Tue Aug 23 12:36:26 2016  | Hide | Hide all
85.png
Attachment 18: 86.png  138 kB  Uploaded Tue Aug 23 12:36:39 2016  | Hide | Hide all
86.png
ELOG V3.1.4-unknown