ID |
Date |
Author |
Subject |
Text |
 |
|
487
|
Sun Nov 27 19:33:00 2016 |
Liu, PV, AE | F11 degrader setting (night Nov27-Nov28) | Analysis of files for two more settings of
F11 degrader to optimize implantation of
40Mg.
|
   |
|
486
|
Sun Nov 27 16:29:51 2016 |
CG, AE, DK | Monday 28 November | 01.28 Beam stopped temporarily.
~750MB into R26_38.
Bias and leakage currents ok, as are |
12x |
|
485
|
Sun Nov 27 12:53:04 2016 |
TD | Offline analysis R24_3 |
S O R T C O M P L E T E ..... Sun Nov |
   |
|
484
|
Sun Nov 27 12:30:41 2016 |
AE, PV | Energy loss in Degraders and Implantation for runs 1028 and 1033 | Implantation profile in AIDA
BigRIPS file 1028
(Attachment run1028.png): Degrader |
6x |
|
483
|
Sun Nov 27 06:35:47 2016 |
TD, DK, AE | Sunday 27 November - part 2 | 14.15 BigRIPS run number is now 1029
15.22 BigRIPS run number is now 1030
|
14x |
|
482
|
Sun Nov 27 05:30:51 2016 |
TD | Offline analysis of R12 | Offline analysis of R12 LEC -> MEC setting
S O R T C O M P L E T E ..... Sun Nov |
   |
|
480
|
Sun Nov 27 03:25:20 2016 |
TD | [How to] AIDA discriminator thresholds | The function and setting of the AIDA discriminators
is as follows:
|
|
|
479
|
Sun Nov 27 02:46:54 2016 |
DK | Offline analysis of R18_2 | Run R18_2: 3 mm Pb, 0.5 mm W (+1 mm Al)
and 0.3 mm W (+1 mm Al)
|
  |
|
478
|
Sat Nov 26 20:26:06 2016 |
Liu, AE | Analysis of implantation profile in AIDA | Here we show the PID plot and implantation
depth in AIDA from BigRIPS file 40Mg1012
(1 hr of data from 20:30 in Nov 26th), merged |
 |
|
477
|
Sat Nov 26 17:14:47 2016 |
TD | Visual scaler inputs | Visual scaler inputs
1 F11
|
|
|
476
|
Sat Nov 26 15:32:38 2016 |
TD, AE, CG, DK | Sunday 27 November | 00.33 DSSSD bias & leakage currents OK - see
attachments 1 & 2
FEE64 temperatures OK - see attachment |
19x |
|
475
|
Sat Nov 26 12:18:25 2016 |
AE | Saturday 26 November, Part III | 19:30 Power cycled of AIDA reuired after Ge
filling
|
6x |
|
474
|
Sat Nov 26 09:17:42 2016 |
AE, TD, DK | Offline analysis of R9_24 |
R9_24 3mm Pb + 0.3mm W (+1mm Al) +
1.0mm W (+1mm Al)
*** data items: 261088000 |
  |
|
473
|
Sat Nov 26 07:45:48 2016 |
TD, DK, AE | Offline analysis of R7_45 | R7_45 3mm Pb + 0.5mm W (+1mm Al) only (at
start of run) changing to 1.5mm W (+2mm Al)
|
  |
|
472
|
Sat Nov 26 07:26:51 2016 |
TD | [How to] Desktop application launchers for Httpd for Data Acquisition & Merge/TapeServer, Merger & TapeServer |
Type: Application in Terminal
Name: Httpd for Data Acquisition
|
|
|
471
|
Sat Nov 26 07:11:34 2016 |
TD, DK, AE | Saturday 26 November, Part II | 16.11 The cyclotron and BigRIPS condition
are now restored and we have good beam
Count |
|
|
470
|
Sat Nov 26 06:57:36 2016 |
DK, TD | Offline analysis of R7_37 |
R7_37 3mm Pb + from 0 to 1.8mm W (+ up to
3mm Al, 1mm per W layer - 0.3mm W, 0.5mm |
   |
|
469
|
Fri Nov 25 22:28:13 2016 |
TD | [How to] Start MIDASsort |
aidas1> setenv MIDASBASE /MIDAS@aidas.240215
aidas1> setenv PATH $MIDASBASE/bin_Linux64:$PATH
|
|
|
468
|
Fri Nov 25 15:56:36 2016 |
CG, DK | Saturday 26 November | 00.55 Bias and leakage currents ok (attachments
1+2).
Temps ok (attachment 3).
|
11x |
|
467
|
Fri Nov 25 07:33:44 2016 |
TD | Friday 25 November | 16.35 DSSSD bias & leakage currents OK - see
attachments 1 & 2
note - the significant increase observed |
9x |