AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 23 of 46  ELOG logo
ID Date Author Subject Text Attachments
  487   Sun Nov 27 19:33:00 2016 Liu, PV, AEF11 degrader setting (night Nov27-Nov28)Analysis of files for two more settings of
F11 degrader to optimize implantation of
40Mg.
 run1038_imp_profile.pngrun1038_imp_pid.pngrun104x_imp_profile.pngrun104x_imp_pid.png 
  486   Sun Nov 27 16:29:51 2016 CG, AE, DKMonday 28 November01.28 Beam stopped temporarily.
      ~750MB into R26_38.
      Bias and leakage currents ok, as are
 12x 
  485   Sun Nov 27 12:53:04 2016 TDOffline analysis R24_3

S O R T    C O M P L E T E ..... Sun Nov
 20.png21.png22.png24.png 
  484   Sun Nov 27 12:30:41 2016 AE, PVEnergy loss in Degraders and Implantation for runs 1028 and 1033Implantation profile in AIDA

    BigRIPS file 1028
(Attachment run1028.png):  Degrader
 6x 
  483   Sun Nov 27 06:35:47 2016 TD, DK, AESunday 27 November - part 214.15 BigRIPS run number is now 1029

15.22 BigRIPS run number is now 1030
 14x 
  482   Sun Nov 27 05:30:51 2016 TDOffline analysis of R12Offline analysis of R12 LEC -> MEC setting

S O R T    C O M P L E T E ..... Sun Nov
 103.png104.png120.png121.png 
  480   Sun Nov 27 03:25:20 2016 TD[How to] AIDA discriminator thresholdsThe function and setting of the AIDA discriminators
is as follows:
  
  479   Sun Nov 27 02:46:54 2016 DKOffline analysis of R18_2Run R18_2: 3 mm Pb, 0.5 mm W (+1 mm Al)
and 0.3 mm W (+1 mm Al)

 
 307-312.png2120-2125.png2110-2115.png 
  478   Sat Nov 26 20:26:06 2016 Liu, AEAnalysis of implantation profile in AIDAHere we show the PID plot and implantation
depth in AIDA from BigRIPS file 40Mg1012
(1 hr of data from 20:30 in Nov 26th), merged
 imp.jpgpid_corr.png 
  477   Sat Nov 26 17:14:47 2016 TDVisual scaler inputsVisual scaler inputs

1 F11
  
  476   Sat Nov 26 15:32:38 2016 TD, AE, CG, DKSunday 27 November 00.33 DSSSD bias & leakage currents OK - see
attachments 1 & 2
      FEE64 temperatures OK - see attachment
 19x 
  475   Sat Nov 26 12:18:25 2016 AESaturday 26 November, Part III19:30 Power cycled of AIDA reuired after Ge
filling
 6x 
  474   Sat Nov 26 09:17:42 2016 AE, TD, DKOffline analysis of R9_24
R9_24 3mm Pb + 0.3mm W (+1mm Al) +
1.0mm W (+1mm Al)

 

 *** data items:  261088000
 rates_r9_24.pngee_r9_24.pngxy_r9_24.png 
  473   Sat Nov 26 07:45:48 2016 TD, DK, AEOffline analysis of R7_45R7_45 3mm Pb + 0.5mm W (+1mm Al) only (at
start of run) changing to 1.5mm W (+2mm Al)
 103.png110.png111.png 
  472   Sat Nov 26 07:26:51 2016 TD[How to] Desktop application launchers for Httpd for Data Acquisition & Merge/TapeServer, Merger & TapeServer
   Type: Application in Terminal
   Name: Httpd for Data Acquisition
  
  471   Sat Nov 26 07:11:34 2016 TD, DK, AESaturday 26 November, Part II16.11 The cyclotron and BigRIPS condition
are now restored and we have good beam

     Count
  
  470   Sat Nov 26 06:57:36 2016 DK, TDOffline analysis of R7_37
R7_37 3mm Pb + from 0 to 1.8mm W (+ up to
3mm Al, 1mm per W layer - 0.3mm W, 0.5mm
 100.png101.png102.pngK3MVQY.tmp 
  469   Fri Nov 25 22:28:13 2016 TD[How to] Start MIDASsort
aidas1> setenv MIDASBASE /MIDAS@aidas.240215
aidas1> setenv PATH $MIDASBASE/bin_Linux64:$PATH
  
  468   Fri Nov 25 15:56:36 2016 CG, DKSaturday 26 November00.55 Bias and leakage currents ok (attachments
1+2).
      Temps ok (attachment 3).
 11x 
  467   Fri Nov 25 07:33:44 2016 TDFriday 25 November16.35 DSSSD bias & leakage currents OK - see
attachments 1 & 2
      note - the significant increase observed
 9x 
ELOG V3.1.4-unknown