549
|
Sat Apr 1 16:16:05 2017 |
OH, CG | Sunday 2 April | 00:12 BigRips started run 0223 (Started at
00:12)
AIDA file R20_344
|
   |
|
548
|
Fri Mar 31 17:21:56 2017 |
CG, OH, DK | Saturday 1 April - Run status | 00.46 34Ne stopped for 36Ne setting (R19_37).
DAQ kept running as I was upstairs
getting some food.
|
9x |
|
547
|
Thu Mar 30 16:12:21 2017 |
DK, OH, CG | Friday, March 31 run status | 00:11 BigRIPS has started a new run at 00:10:42
run 0165.
AIDA subrun R16_357 was about halfway |
14x |
|
546
|
Wed Mar 29 18:02:12 2017 |
OH, TD, DK, CG | Thursday 30th March | 02:02 Recovered DAQ from crash. Merger became
clogged and the system required a full restart.
Raspberry pi also
|
31x |
|
545
|
Wed Mar 29 17:49:36 2017 |
DK | cshrc hacking w/ MIDAS | The ~/.cshrc was modified to change the MIDAS
path for a convenient analysis method, but
it should be done in a shell script instead, |
|
|
544
|
Wed Mar 29 13:38:38 2017 |
OH, DK, CG | First beam runs | For BigRIPS run numbers, they are available
online: http://bripscnt01.rarfadv.riken.jp/runsum/index.php
|
|
|
543
|
Wed Mar 29 13:02:17 2017 |
TD | Report - high - interaction between DHCP and FEE64 authenticated mount requests |
What has happened here?
|
|
|
542
|
Wed Mar 29 08:13:34 2017 |
DK, PV, JL, CG | Degrader, Pb wall opening | 16:21
Chris noticed that when the degraders that |
|
|
541
|
Wed Mar 29 05:08:04 2017 |
TD | Report - medium - delayed or missing authenticated mount requests following FEE64 power cycle | This is not, I think, a new observation.
Following FEE64 power cycles we sometimes |
|
|
540
|
Wed Mar 29 00:23:12 2017 |
TD | Analysis of Mar2017/R3 | Analysis of Mar2017/R3_0 ... R3_9 by MIDASsort
*** ENTRY finish
|
8x |
|
539
|
Wed Mar 29 00:02:49 2017 |
TD | Wednesday 29 March | 08.02 DAQ halted overnight
System checks OK *except* for nnaida1 |
21x |
|
538
|
Tue Mar 28 01:28:12 2017 |
TD, CG, OH, DK | Tuesday 28 March |
09.13 DAQ run R3 ends OK (final file R3_9)
|
15x |
|
537
|
Mon Mar 27 03:29:05 2017 |
OH, TD, DK, CG | Monday 27 March | 11:28 Biases and leakages okm (see attachment
1)
|
15x |
|
536
|
Mon Mar 27 03:28:53 2017 |
DK, TD, JA | Clock settings at the waveform generator stage | Clock settings for this experiment are slightly
different than in the previous case.
|
|
|
535
|
Sun Mar 26 03:53:43 2017 |
CG, OH | Sunday 26th March | 10.30 Left DAQ running overnight to look for
alphas in DSSDs.
DSSD bias still ok @ 23.3oC (see att. |
 |
|
534
|
Thu Mar 23 10:56:29 2017 |
CG, OH | Thursday 23rd March - DSSD replacement + move |
10.00 Investigating DSSD2 (MSL BB18-1000
3058-9) missing channels, found broken bond |
7x |
|
533
|
Tue Mar 21 08:04:43 2017 |
CG, OH | Tuesday 21 March - AIDA checks | 10.00 Powered system on and biased.
Bias voltages and leakage currents
ok (see att. 1). Ambient temp @23.1oC.
|
    |
|
532
|
Thu Feb 2 13:44:02 2017 |
OH | T9 Test Bench | T9 test setup at Daresbury was powered up
and noise levels were checked using a pulser
peak.
|
  |
|
531
|
Wed Feb 1 16:54:40 2017 |
CG | NP1306 run summary | |
|
|
530
|
Wed Jan 18 14:16:47 2017 |
Patrick Coleman-Smith | Repaired Modules returning to RIKEN | Five modules are being returned to RIKEN
after repair.
The MAC addresses are :- |
|