AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 16 of 46  ELOG logo
ID Date Author Subject Text Attachments
  634   Mon Jun 5 16:02:50 2017 OH, PV, AETuesday 06 June 00.00-08.0000:03 BigRIPS starts run 3007
      BRIKEN starts run 007
      AIDA on file R5_146
 40x 
  633   Mon Jun 5 08:43:24 2017 CB, TD, PW, DKMonday 5 June 16:00 to 24:0016:43  Leakage currents OK - see attachment
1
       FEE64 temperatures OK - see attachment
 38x 
  632   Sun Jun 4 23:50:24 2017 CB, PW, DK, TDMonday 5 June 08:00 to 16:0007:50  Leakage currents OK - attachment 1
       FEE64 temperatures OK - attachment
2
 24x 
  631   Sun Jun 4 16:00:49 2017 NN, OHMonday 5 June 00:00 to 08:0023:59   BigRIPS and Briken stop their DAQ
        AIDA run file R2_245
 19x 
  630   Sun Jun 4 08:13:10 2017 LHB, PV, NN4th June 16.00-00.0016.25  *All* system wide checks OK *except*
ADC calibration of nnaida1, 21 and nnaida1
clock status (status=6)
 28x 
  629   Sun Jun 4 00:06:18 2017 OH, TD, PJWSunday 4 June 08.00-16.0008:00 DAQ found stopped at around 04:49 -
Attachment 1
      Time obtained from last file written
 32x 
  628   Sat Jun 3 08:07:48 2017 OH, CB, AESaturday 3 June 16:00-24:0016:26 DAQ continues OK
      all system wide checks ok, *except*
nnaida1 clock status (6), nnaida1, 21 ADC
 1.png2.png3.png4.png5.png 
  627   Sat Jun 3 05:32:09 2017 TDReport - high - MBS correlation scaler anomalies
The analysis of files RIBF127R1/R1_1478 to
R1_1486 is appended. This sequence of files
 testmbs 
  626   Sat Jun 3 00:00:11 2017 LJB, PW, TD, OHSaturday 3 June 08.00-16.0008.29 BRIKEN 100; BigRIPS 1111 stopping run.
      AIDA on run R1_1429
 19x 
  625   Fri Jun 2 16:02:37 2017 CBSaturday 3 June 00:00-08:0000:02  Noise in nnaida 1 and 2 appears to
be reduced.
       However, some channels in nnaida1,
 28x 
  624   Fri Jun 2 08:25:34 2017 LHB2nd June Evening Shift16.34  Beam is off
       Aida R_1216, BRIKEN (83)/BigRIPS (1094)
continue to run for background data
 20x 
  623   Fri Jun 2 00:01:48 2017 OH, PW, CBFriday 2 June 08:00-16:0008:05 Briken and BigRIPS stopping daqs
      AIDA on file R1_1099
 9x 
  622   Thu Jun 1 16:06:03 2017 NNFriday 2 June 00:00-08:00 00:35   Beam is on
        current AIDA file R1_996
 14x 
  621   Thu Jun 1 08:49:39 2017 LHB, PVThursday 1 June Evening Shift16.44 DAQ stop BigRIPS, BRIKEN
      AIDA file RIBF127R1/R1_886
 27x 
  620   Thu Jun 1 00:00:25 2017 TD, PV, CBThusrday 1 June 08.00-16.0007.57 run continues
      BRIKEN start run 55
      BigRIPS start run 1066
 17x 
  619   Wed May 31 16:48:54 2017 TDThursday 1 June 00.00-08.0000.48 BigRIPS DAQ now running

      BRIKEN start run 48
 42x 
  618   Wed May 31 16:43:52 2017 TDMerger & TapeServer server startup scripts modified
aidas1> cd /MIDAS/Merger/AIDA
aidas1> ls
 StartupAidaTapeServer 
  617   Wed May 31 08:00:26 2017 NN, CBWednesday 31 May 16:00 - 24:0016:30  Check online data ok (R1_533) see attachment
1
 15x 
  616   Wed May 31 00:02:41 2017 VP, CBWednesday 31 May 08:00 - 16:0008:02 BRIKEN starts run 1032
      BigRIPS starts run 31
      AIDA on file R1_423
 10x 
  615   Tue May 30 16:05:12 2017 OHWednesday 31 May 00:00 - 08:0000:05 BigRIPS and BRIKEN stop their daqs
      AIDA currently on file R1_312
 9x 
ELOG V3.1.4-unknown