AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 19 of 44  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sun May 7 01:29:50 2017, OH, TD, Sunday 7 May 13x

09.28 DAQ continues OK 
      Current file May2017/R1_36
Entry  Sat May 6 03:32:38 2017, OH, TD, Saturday 6 May 8x

11.30 Detector biases & leakage currents OK - see attachments 1 & 2
      Ambient Temperature 24.3 Humidity 37.5% Dew Point 8.9
Entry  Fri May 5 08:03:36 2017, OH, TD, Friday May 5th 10x
Relatively painless start-up. Had an issue with firefox where all bookmarks had been forgotten.
All drop down menues in the DAQ did not work.
Kill all firefox processes to restore.
Entry  Thu Apr 13 15:08:31 2017, CB, Card test 8us.png4us.png0.5us.pngPlot.pngPlot_teflon.png
I tested the FWHM of a BNC PB-5 pulser signal as a function of shaping time using the first produced ISOL FEE64 card in Daresbury Labs.

Find attached four representative spectra per ASIC taken with 8, 5 and 0.5 us shaping time values. Run times are different.

Also find attached a plot of the FWHM as a function of the shaping time for the first channel in each ASIC. There appears to be a maximum of
Entry  Wed Apr 5 06:11:08 2017, OH, BigRIPS particle ID 
I've been going through collecting the BigRIPS root files with Phong and making sure they are on AIDAs1.

The files we have for NP1306 are not the standard format so to get particle ID you need to do this command taken
Entry  Wed Apr 5 06:10:55 2017, OH, BigRIPS particle ID 
 
Entry  Sun Apr 2 04:40:00 2017, DK, BigRIPS Summary Info 
It is all saved locally file:///homes/npg/Documents/2017Ca/

Although, a little more hacking is required to get the view.html webpage to allow you to click each run
Entry  Sun Apr 2 03:32:30 2017, DK, OH, Pulser walkthrough bias_2_a.png
11:32 Pulser walkthrough, 90k down to 10k, 10k steps, 1 min per step
      R26
    
Entry  Sat Apr 1 16:16:05 2017, OH, CG, Sunday 2 April bias_020417_0146.pngbias_020417_0742.pngBigRIPSlogbias_020417_0922.png
00:12 BigRips started run 0223 (Started at 00:12)
      AIDA file R20_344
      System wide checks all ok
Entry  Fri Mar 31 17:21:56 2017, CG, OH, DK, Saturday 1 April - Run status 9x
00.46 34Ne stopped for 36Ne setting (R19_37).
      DAQ kept running as I was upstairs getting some food.
      Stopped at R19_45.
Entry  Thu Mar 30 16:12:21 2017, DK, OH, CG, Friday, March 31 run status 14x
00:11 BigRIPS has started a new run at 00:10:42 run 0165.
      AIDA subrun R16_357 was about halfway (~1 GB) at 00:11.
      BRIKEN run 21 ( so-called 170331_0012_Mg40 )
Entry  Wed Mar 29 18:02:12 2017, OH, TD, DK, CG, Thursday 30th March 31x
02:02 Recovered DAQ from crash. Merger became clogged and the system required a full restart. Raspberry pi also
required a restart to regain control of the USB power relay.
      AIDA R16 started
Entry  Wed Mar 29 17:49:36 2017, DK, cshrc hacking w/ MIDAS 
The ~/.cshrc was modified to change the MIDAS path for a convenient analysis method, but it should be done in a shell script instead, as it pushes the MIDAS
BASE to all instances 
of MIDAS, such as the Run Control, etc.
Entry  Wed Mar 29 13:38:38 2017, OH, DK, CG, First beam runs biases_firstbeam.png
For BigRIPS run numbers, they are available online: http://bripscnt01.rarfadv.riken.jp/runsum/index.php

21:30 AIDA and BRIKEN are ready to go -- so we closed the door and asked the BigRIPS team to send the beam to
Entry  Wed Mar 29 13:02:17 2017, TD, Report - high - interaction between DHCP and FEE64 authenticated mount requests 

What has happened here?
Entry  Wed Mar 29 08:13:34 2017, DK, PV, JL, CG, Degrader, Pb wall opening 
16:21

Chris noticed that when the degraders that are at the beam right position when they are "out" may not be fully removed from the beamline.  It's difficult
Entry  Wed Mar 29 05:08:04 2017, TD, Report - medium - delayed or missing authenticated mount requests following FEE64 power cycle messages.log
This is not, I think, a new observation.

Following FEE64 power cycles we sometimes observe delayed ( ~5-15 minutes ) authenticated mount requests
Entry  Wed Mar 29 00:23:12 2017, TD, Analysis of Mar2017/R3 8x
Analysis of Mar2017/R3_0 ... R3_9 by MIDASsort

*** ENTRY finish
Entry  Wed Mar 29 00:02:49 2017, TD, Wednesday 29 March 21x
08.02 DAQ halted overnight

      System checks OK *except* for nnaida1 global clocks error 6 and some SYNC errors - see attachments 1-5
Entry  Tue Mar 28 01:28:12 2017, TD, CG, OH, DK, Tuesday 28 March 15x

09.13 DAQ run R3 ends OK (final file R3_9)
      
ELOG V3.1.4-unknown