AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 25 of 46  ELOG logo
IDup Date Author Subject Text Attachments
  490   Mon Nov 28 06:49:04 2016 DKOffline analysis R27_1Conditions: One Pb wall with empty windows.
3mm Pb degrader closer to AIDA, on the front
of PE wall
 r27_1-307.pngr27_1-2110.pngr27_1-2120.png 
  491   Mon Nov 28 11:55:20 2016 TDOffline analysis R30_2Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al
+ 1mm W/1mm Al)
 20.png21.png22.png 
  492   Mon Nov 28 13:12:31 2016 PV, AE, LiuImplantation profile in AIDA with 8mm Al replacing 3 mm PbData for ~3 hrs: Nov 28th, 20:06 to 23:16

Bigrips run 1060 to 1062

AIDA run R30_ 2 to R30_40
 10.pngimp_dssd_106x.pngimp_pid_106x.pngimp_xy_106x.pngpid_r106x.png 
  493   Mon Nov 28 15:53:39 2016 AE, AT, RG, CGDAQ synchronization We noticed a peculiar feature in the time-stamp
synchronization monitor. The spectra of timestamp
difference between pairs of DAQ systems show,
 7x 
  494   Mon Nov 28 18:07:14 2016 CG, TD, AE, DKTuesday 29 November01:39 : Attachment 26 (R30_70to72) shows a
gradual change in the hit pattern for DSSD2
(at the lower left
 42x 
  496   Tue Nov 29 05:18:50 2016 TDOffline analysis of R31Offline analysis of AIDA data files from R31_0
to c. R31_5 (elapsed time 1120.45s)
 10x 
  497   Tue Nov 29 12:21:35 2016 TDOffline analysis R35_1

S O R T    C O M P L E T E ..... Tue Nov
 8x 
  498   Tue Nov 29 15:12:33 2016 CG, AE, TD, DKWednesday 30 November00.11 Beam stopped for target @F8 change.
      R35 stopped at R35_62.
      BRIKEN file 161129_1951 155->159
 13x 
  499   Tue Nov 29 19:07:35 2016 AE, CG, ATS, ATF11 conditions after change to C target in F8 [light particles?]The main experiment changed to a carbon
reaction target at F8 (similar thickness
of CH2 previously used), and retuned the
 visual_scal_4am_Cin_F7.pngpid_r1093.pngimp_ch2.pngpid_ch2.pnghits_ch2.png 
  500   Wed Nov 30 04:56:40 2016 TDOffline analysis R38_33
Degrader 8mm Al fixed + ( 0.3mm W/1mm Al
+ 1mm W/1mm Al) variable
 9x 
  501   Wed Nov 30 05:30:20 2016 TDOffline analysis R39_6
Degrader 8mm Al fixed + ( 0.5mm W/1mm Al
+ 1mm W/1mm Al) variable
 8x 
  502   Wed Nov 30 06:31:04 2016 PV, TD, RCF, LiuImplantation profile in AIDA R39 2 to 9, after changing degrader at 13:30Degrader setting was:
Variable degrader:
0.5 mm W + 1 mm Al : in
 29.png22.png12.png 
  503   Wed Nov 30 06:33:52 2016 TDOffline analysis R36_30
Following target change from (CH2)n to C
 8x 
  504   Wed Nov 30 06:42:01 2016 TDOffline analysis of R39_26Following degrader change to  (8mm Al) fixed
+ ( 0.3mm W/1mm Al + 0.5mm/1mm Al + 1mm W/1m
Al) variable
 8x 
  505   Wed Nov 30 08:41:37 2016 PV, TD, RCF, LiuImplantation profile in AIDA R39 37 to 46, after changing degrader at 16:23
Degrader setting:
Variable degrader:
0.5
mm W + 1 mm Al : in
0.3 mm W + 1 mm Al :
in
1 mm W + 1 mm Al : in
Fix degrader:
20mm
 01.png52.png44.png 
  506   Wed Nov 30 11:10:10 2016 TDCorrelation_Check.ccd /TapeData/RIBF03R1
~/td/a.out R31 10000 > /tmp/R31.out
~/td/a.out R31 24 > /tmp/R31-2.out
 R31.outR31-2.outR42.out 
  507   Wed Nov 30 11:36:32 2016 TDOffline analysis of R41_2Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al
+ 0.5mm/1mm Al + 1mm W/1m Al) variable
 8x 
  508   Wed Nov 30 21:26:52 2016 CG, DK, TDThursday 1 December00.51 BigRIPS data file 1112.

01.50 BigRIPS data file 1113.
 10x 
  509   Thu Dec 1 00:21:08 2016 DKOffline analysis of R42_7Checking that the implantation is still
reasonable after LN2 fill recovery. 

Degrader condition is 8. + 0.2
 r42_2110.pngr42_307.pngr42_2120.pngr42-301.pngr42-2000.png 
  510   Thu Dec 1 02:25:41 2016 DKOffline analysis of R42_32Offline analysis of AIDA R42_32.

Degrader condition of F11 is with the same
 6x 
ELOG V3.1.4-unknown