ID |
Date |
Author |
Subject |
Text |
|
147
|
Tue Feb 2 14:08:44 2016 |
CG, TD | Report: Low - No SYNCs from FEEs | Currently running with a source, and everything
seems to be running fine in terms of histograms
doing what we expect, no error messages etc. |
|
129
|
Thu Dec 3 10:12:08 2015 |
CG, TD | Report: Low - RPi power cable can't be fully inserted due to case conflict | The RPi power cable cannot sit fully in
the connector, and the lock pins can't engage,
because the case gets in the way of the plastic |
|
137
|
Wed Jan 6 16:06:32 2016 |
CG, TD, PJCS | Report: Low - RPi power cable can't be fully inserted due to case conflict - solved |
|
|
122
|
Thu Nov 19 12:19:15 2015 |
CG, TD | Report: Low - nnaida12 ASIC4 not functioning | Current nnaida12 (MAC address 2b:09:e8)
has several noisy channels in ASICs 1-3,
whilst ASIC4 does not work at all. |
|
155
|
Thu Feb 18 13:23:03 2016 |
TD | Report: high: MERGE error messages | During R30 ( see https://elog.ph.ed.ac.uk/AIDA/154
) obtain the following merger error messages
(rate ~ 10 per minute) with merger rate ~100-200k |
|
396
|
Thu Oct 20 20:00:14 2016 |
CG | Returned module tests @ DL | Original system configuration before my arrival:
nnaida11 - 2b:22:6e
|
7x |
140
|
Fri Jan 15 16:50:09 2016 |
CG, TD | Ribbon cable + couple tests at DL | 12/01/16 (Attachments
1-8)
FEEs set up as per ELOG entry 136 |
20x |
144
|
Wed Jan 20 17:02:47 2016 |
CG, TD | Ribbon cable + coupler tests at DL | 18/01/16
Set up as last week but with 8us
shaping time. |
17x |
146
|
Thu Jan 28 13:53:29 2016 |
CG, TD | Ribbon cable + coupler tests at DL - 25-26th Jan | 25/01/16
On start up, received error when
trying to access spectrum browser (attachment |
15x |
149
|
Wed Feb 3 15:34:30 2016 |
CG, TD | Ribbon cable + coupler tests at DL 1st-2nd Feb | 01/02/16
Started up system. Biased det to
+200V |
|
150
|
Tue Feb 9 17:27:12 2016 |
CG, TD | Ribbon cable + coupler tests at DL 8-9th Feb | 08/02/16
Spoke to PJC-S -> Ethernet cables
from FEEs to switch are all 4m Cat6. |
|
322
|
Tue Jul 5 09:39:27 2016 |
DK | Rly16 is not online | AIDA was relocated, and now I want to power
it on to do some tests. However, I
cannot get the Rly16 service running. |
|
114
|
Fri Jul 17 16:00:38 2015 |
CG | Run summary for Apr-May 2015 |
A table summarising the run information
within the lab book and ELog for Apr-May. |
|
136
|
Tue Dec 15 11:17:05 2015 |
TD | STFC DL tests - 14-15.12.15 | BNC PB-5 Pulser
Fall time 1.0ms
|
13x |
651
|
Sat Jun 10 02:40:18 2017 |
DK | Sat 10 June 8:00 ~ 16:00 | 10:40 Put lead wall in front of AIDA during
beam tuning.
|
|
43
|
Sat Feb 21 06:37:52 2015 |
CG, AE, TD | Sat 21st Feb progress | 21/02/15
1230: Developing the software to
check synchronisation between DAQs. Below |
6x |
548
|
Fri Mar 31 17:21:56 2017 |
CG, OH, DK | Saturday 1 April - Run status | 00.46 34Ne stopped for 36Ne setting (R19_37).
DAQ kept running as I was upstairs
getting some food.
|
9x |
823
|
Sat Jun 1 08:11:15 2019 |
TD | Saturday 1 June | 16.08 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 60% M-H markers - topup |
14x |
366
|
Sat Oct 1 07:48:48 2016 |
CG & TD | Saturday 1 October | 11.00 Moved detector stack forward several
cm. 1st DSSD now ~6cm from end of snout.
Middle of stack now ~47cm from
|
14x |
650
|
Fri Jun 9 16:22:54 2017 |
PV | Saturday 10 June 00:00-08:00 | 00:21 BigRIPS and BRIKEN stop their DAQ
AIDA run file R7_826
|
28x |