AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 25 of 46  ELOG logo
ID Date Author Subjectup Text Attachments
  147   Tue Feb 2 14:08:44 2016 CG, TDReport: Low - No SYNCs from FEEsCurrently running with a source, and everything
seems to be running fine in terms of histograms
doing what we expect, no error messages etc.
 noSYNCs.png 
  129   Thu Dec 3 10:12:08 2015 CG, TDReport: Low - RPi power cable can't be fully inserted due to case conflictThe RPi power cable cannot sit fully in
the connector, and the lock pins can't engage,
because the case gets in the way of the plastic
  
  137   Wed Jan 6 16:06:32 2016 CG, TD, PJCSReport: Low - RPi power cable can't be fully inserted due to case conflict - solved


   
        
            
  
  122   Thu Nov 19 12:19:15 2015 CG, TDReport: Low - nnaida12 ASIC4 not functioningCurrent nnaida12 (MAC address 2b:09:e8)
has several noisy channels in ASICs 1-3,
whilst ASIC4 does not work at all.
 nnaida12_stats.pngnnaida12_ASIC4_checkError.png 
  155   Thu Feb 18 13:23:03 2016 TDReport: high: MERGE error messagesDuring R30 ( see https://elog.ph.ed.ac.uk/AIDA/154
) obtain the following merger error messages
(rate ~ 10 per minute) with merger rate ~100-200k
  
  396   Thu Oct 20 20:00:14 2016 CGReturned module tests @ DLOriginal system configuration before my arrival:
nnaida11 - 2b:22:6e
                                        
 7x 
  140   Fri Jan 15 16:50:09 2016 CG, TDRibbon cable + couple tests at DL 12/01/16      (Attachments
1-8)
FEEs set up as per ELOG entry 136
 20x 
  144   Wed Jan 20 17:02:47 2016 CG, TDRibbon cable + coupler tests at DL 18/01/16
Set up as last week but with 8us
shaping time.
 17x 
  146   Thu Jan 28 13:53:29 2016 CG, TDRibbon cable + coupler tests at DL - 25-26th Jan 25/01/16
On start up, received error when
trying to access spectrum browser (attachment
 15x 
  149   Wed Feb 3 15:34:30 2016 CG, TDRibbon cable + coupler tests at DL 1st-2nd Feb01/02/16
Started up system. Biased det to
+200V 
  
  150   Tue Feb 9 17:27:12 2016 CG, TDRibbon cable + coupler tests at DL 8-9th Feb08/02/16
Spoke to PJC-S -> Ethernet cables
from FEEs to switch are all 4m Cat6.
 allnnaida_inSafe_cablesIsolated_0.5us.pngallnnaida_inSafe_cablesIsolated_1us.pngallnnaida_inSafe_cablesIsolated_2us.pngallnnaida_inSafe_cablesIsolated_4us.pngallnnaida_inSafe_cablesIsolated_8us.png 
  322   Tue Jul 5 09:39:27 2016 DKRly16 is not onlineAIDA was relocated, and now I want to power
it on to do some tests.  However, I
cannot get the Rly16 service running.
 usb_serial.JPG 
  114   Fri Jul 17 16:00:38 2015 CGRun summary for Apr-May 2015 
A table summarising the run information
within the lab book and ELog for Apr-May.
 RIKEN_may2015_runSummary.xlsx 
  136   Tue Dec 15 11:17:05 2015 TDSTFC DL tests - 14-15.12.15BNC PB-5 Pulser

Fall time 1.0ms
 13x 
  651   Sat Jun 10 02:40:18 2017 DKSat 10 June 8:00 ~ 16:0010:40    Put lead wall in front of AIDA during
beam tuning.
 R7_1002.txt 
  43   Sat Feb 21 06:37:52 2015 CG, AE, TDSat 21st Feb progress21/02/15
1230: Developing the software to
check synchronisation between DAQs. Below
 6x 
  548   Fri Mar 31 17:21:56 2017 CG, OH, DKSaturday 1 April - Run status00.46 34Ne stopped for 36Ne setting (R19_37).
      DAQ kept running as I was upstairs
getting some food.
 9x 
  823   Sat Jun 1 08:11:15 2019 TDSaturday 1 June16.08 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
      Water level c. 60% M-H markers - topup
 14x 
  366   Sat Oct 1 07:48:48 2016 CG & TDSaturday 1 October11.00 Moved detector stack forward several
cm. 1st DSSD now ~6cm from end of snout.
Middle of stack now ~47cm from
 14x 
  650   Fri Jun 9 16:22:54 2017 PVSaturday 10 June 00:00-08:0000:21  BigRIPS and BRIKEN stop their DAQ
       AIDA run file R7_826
 28x 
ELOG V3.1.4-unknown