AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 27 of 44  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue Oct 18 01:43:04 2016, TD, Tuesday 18 October 33x
09/42 DAQ found stopped, no merger error messages
      Most recent file R52_211, last accessed 06.30
      Restart merger OK
Entry  Mon Oct 17 04:10:30 2016, TD, Monday 17 October 7x
12.05 DAQ found stopped
      Most recent file R49_226, last accessed 06.26
      Restart merger OK
Entry  Sun Oct 16 03:14:41 2016, TD, Sunday 16 October 16x
11.12 DAQ start (R47)

      Detector bias and leakage currents OK - see attachments 1 & 2
Entry  Sat Oct 15 03:27:31 2016, TD, Saturday 15 October 10x
11.27 DAQ found stopped
      Most recent file R42_164, last accessed 07.18
      Restart merger OK
Entry  Thu Oct 13 16:12:06 2016, TD & CG, Friday 14 October 14x

DAQ continues (R33)
Entry  Thu Oct 13 06:07:43 2016, TD & CG, Thursday 13 October 1.png2.png3.png4.png5.png

11.40 Power cycle AIDA FEE64s
      Set TS_SYNC_PHASE 0
Entry  Wed Oct 12 02:58:19 2016, TD & CG, Wednesday 12 October 1.png2.png3.png4.png5.png
10.50 Merger & TapeServer found stopped
      connect errors - see attachment 1
Entry  Tue Oct 11 03:34:02 2016, CG & TD, Tuesday 11 October 16x
10.40 DAQ found stopped

      All FEE64 AIDA SYNC rates zero, AIDA SYNC count ~ 13.8M => DAQ stopped @ 06.35
Entry  Mon Oct 10 03:15:59 2016, CG & TD, Monday 10 October 25x

10.30 DAQ found stopped
Entry  Sun Oct 9 11:47:34 2016, CG, TD, Sunday 9th October 9x

12.30 Following scheduled power outages of October 8
Entry  Fri Oct 7 02:43:47 2016, TD & CG, Analysis of Sept2016/R13_47 Unsaved_Document_1
Analysis of R13_47 - the data file that was being written when DAQ stalled
yesterday evening - see https://elog.ph.ed.ac.uk/AIDA/371
Entry  Fri Oct 7 02:29:19 2016, TD & CG, Friday 7 October 22x
10.29 DAQ left running overnight
      Histograms only - no data transfer to Merger & TapeServer
Entry  Thu Oct 6 13:22:24 2016, TD, Images of setup at F11 - 4 IMG_6702.JPG
 
Entry  Thu Oct 6 13:20:34 2016, TD, Images of setup at F11 - 3 IMG_6695.JPGIMG_6696.JPGIMG_6701.JPG
 
Entry  Thu Oct 6 13:09:50 2016, TD, Images of setup at F11 - 2 IMG_6692.JPGIMG_6693.JPGIMG_6694.JPG
 
Entry  Thu Oct 6 12:39:14 2016, TD, Images of setup at F11 IMG_6687.JPGIMG_6689.JPGIMG_6690.JPG
 
Entry  Thu Oct 6 11:16:40 2016, CG & TD, Thursday 6 October 9x

DSSSD bias voltages and leakage currents OK - see attachments 1 & 2
FEE64 temperatures OK - see attachment 3
Entry  Wed Oct 5 07:29:29 2016, CG & TD, Wednesday 5 October (inc AIDA+BRIKEN photos) 11x
14.30 Adjusted and checked insertion of AIDA snout into BRIKEN (CH2)n moderator.
      up-down    AIDA snout appears centred (@ (CH2)n centre) and tracks into (CH2)n moderator with no
significant vertical movement
Entry  Sun Oct 2 15:03:11 2016, CG, TD, Problems compiling AIDAsort program on aidas1 make.logmake.logEditransfer.h

I have been trying to compile the sort program I have been working on in Edinburgh so I can work on it locally
while at RIKEN.
Entry  Sun Oct 2 06:12:54 2016, TD, Sunday 2 October 16x

14.15 DSSSD bias/leakage current OK - see attachments 1-2
      FEE64 temperatures OK - see attachment 3
ELOG V3.1.4-unknown