AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 27 of 46  ELOG logo
IDup Date Author Subject Text Attachments
  532   Thu Feb 2 13:44:02 2017 OHT9 Test BenchT9 test setup at Daresbury was powered up
and noise levels were checked using a pulser
peak.
 nnaida114_10.pngnnaida11.pngnnaida114_7.png 
  533   Tue Mar 21 08:04:43 2017 CG, OHTuesday 21 March - AIDA checks10.00 Powered system on and biased.
      Bias voltages and leakage currents
ok (see att. 1). Ambient temp @23.1oC.
 bias1.pnglayout4.pngnnaida19.pnglayout3.pngnnaida13.png 
  534   Thu Mar 23 10:56:29 2017 CG, OHThursday 23rd March - DSSD replacement + move
10.00 Investigating DSSD2 (MSL BB18-1000
3058-9) missing channels, found broken bond
 7x 
  535   Sun Mar 26 03:53:43 2017 CG, OHSunday 26th March10.30 Left DAQ running overnight to look for
alphas in DSSDs.
      DSSD bias still ok @ 23.3oC (see att.
 bias_260317.pngnniada15_w_260317.png 
  536   Mon Mar 27 03:28:53 2017 DK, TD, JAClock settings at the waveform generator stageClock settings for this experiment are slightly
different than in the previous case.
  
  537   Mon Mar 27 03:29:05 2017 OH, TD, DK, CGMonday 27 March11:28 Biases and leakages okm (see attachment
1)
 15x 
  538   Tue Mar 28 01:28:12 2017 TD, CG, OH, DKTuesday 28 March
09.13 DAQ run R3 ends OK (final file R3_9)
      
 15x 
  539   Wed Mar 29 00:02:49 2017 TDWednesday 29 March08.02 DAQ halted overnight

      System checks OK *except* for nnaida1
 21x 
  540   Wed Mar 29 00:23:12 2017 TDAnalysis of Mar2017/R3Analysis of Mar2017/R3_0 ... R3_9 by MIDASsort

*** ENTRY finish
 8x 
  541   Wed Mar 29 05:08:04 2017 TDReport - medium - delayed or missing authenticated mount requests following FEE64 power cycleThis is not, I think, a new observation.

Following FEE64 power cycles we sometimes
 messages.log 
  542   Wed Mar 29 08:13:34 2017 DK, PV, JL, CGDegrader, Pb wall opening16:21

Chris noticed that when the degraders that
  
  543   Wed Mar 29 13:02:17 2017 TDReport - high - interaction between DHCP and FEE64 authenticated mount requests
What has happened here?
  
  544   Wed Mar 29 13:38:38 2017 OH, DK, CGFirst beam runsFor BigRIPS run numbers, they are available
online: http://bripscnt01.rarfadv.riken.jp/runsum/index.php
 biases_firstbeam.png 
  545   Wed Mar 29 17:49:36 2017 DKcshrc hacking w/ MIDASThe ~/.cshrc was modified to change the MIDAS
path for a convenient analysis method, but
it should be done in a shell script instead,
  
  546   Wed Mar 29 18:02:12 2017 OH, TD, DK, CGThursday 30th March02:02 Recovered DAQ from crash. Merger became
clogged and the system required a full restart.
Raspberry pi also
 31x 
  547   Thu Mar 30 16:12:21 2017 DK, OH, CGFriday, March 31 run status00:11 BigRIPS has started a new run at 00:10:42
run 0165.
      AIDA subrun R16_357 was about halfway
 14x 
  548   Fri Mar 31 17:21:56 2017 CG, OH, DKSaturday 1 April - Run status00.46 34Ne stopped for 36Ne setting (R19_37).
      DAQ kept running as I was upstairs
getting some food.
 9x 
  549   Sat Apr 1 16:16:05 2017 OH, CGSunday 2 April00:12 BigRips started run 0223 (Started at
00:12)
      AIDA file R20_344
 bias_020417_0146.pngbias_020417_0742.pngBigRIPSlogbias_020417_0922.png 
  550   Sun Apr 2 03:32:30 2017 DK, OHPulser walkthrough11:32 Pulser walkthrough, 90k down to 10k,
10k steps, 1 min per step
      R26
 bias_2_a.png 
  551   Sun Apr 2 04:40:00 2017 DKBigRIPS Summary InfoIt is all saved locally file:///homes/npg/Documents/2017Ca/

Although, a little more hacking is required
  
ELOG V3.1.4-unknown