AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 2 of 46  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Wed Apr 22 07:28:25 2015, AE (PM), Mechanical setup instructions: AIDA+EURICA at F11 AIDA_procedure_document.docx
Entry  Mon Nov 28 15:53:39 2016, AE, AT, RG, CG, DAQ synchronization  7x
Entry  Tue Jul 14 18:06:54 2015, AE, CG, [Data Analysis] Correlation Scaler timestamp in PID data (go4_30**.root) 10x
Entry  Mon Dec 14 19:25:35 2015, AE, CG ,Phong, Merger/TapeServer trouble report master_no_data_transfer.pngmaster_no_data_transfer.pngerror_when_stop_daq_merger_running.pngerror_show_1_3_8_kaput.pngout_term.txt
Entry  Tue Nov 29 19:07:35 2016, AE, CG, ATS, AT, F11 conditions after change to C target in F8 [light particles?] visual_scal_4am_Cin_F7.pngpid_r1093.pngimp_ch2.pngpid_ch2.pnghits_ch2.png
Entry  Fri Jun 10 21:07:52 2016, AE, DK, TD, ML, MA, Saturday 11 June 2016 8x
Entry  Sun Nov 27 12:30:41 2016, AE, PV, Energy loss in Degraders and Implantation for runs 1028 and 1033 6x
Entry  Sat Jun 10 09:24:45 2017, AE, TD, Saturday 19 June 16.00-24.00 24x
Entry  Sat Nov 26 09:17:42 2016, AE, TD, DK, Offline analysis of R9_24 rates_r9_24.pngee_r9_24.pngxy_r9_24.png
Entry  Sat Jun 11 10:29:16 2016, AE, TD, LHB, synchronization between different FEEs AIDA10_20_pulser_allign.pngAIDA10_40_pulser_allign.pngAIDA34_puls_alignm.png
Entry  Sat May 14 11:27:09 2016, AE, VP, [How To] DAQ correlation monitor (June16 campaign) sync2.pngsync3.pngsync5.pngsync6.png
Entry  Wed May 11 06:01:16 2016, AE, VP, BM, Beta trigger Trigger_scheme-new.jpg
Entry  Wed May 11 06:37:32 2016, AE, VP, BM, Wednesday 11 May Eurica_timestamp.pngAIDA_timestamp.pngTimestamp_correlation_AIDA_EURICA.png
Entry  Thu May 12 16:55:37 2016, AE, VP, BM, Thursday May 12 7x
Entry  Wed May 11 06:00:56 2016, AE, VP, BM (Byul Moon), FEE64 <-> MACB trigger mapping dssd_layout.jpg
Entry  Tue May 31 16:03:24 2016, AE. VP, Co/Bi source run (R17) 8x
Entry  Sat Dec 12 03:30:50 2015, Alfred, Chris, Phong, change configuration of NNAIDA modules in setup 
Entry  Fri Oct 24 16:02:26 2014, Alfredo Estrade, bench tests with pulser nnaida13_1.2.L_pulser_noDSSD.pngpulser_nnaida13_sample.pngnoise_nnaida11_DSSD_sample2.pngnoise_nnaida12_DSSD_sample.png
Entry  Wed Dec 3 12:13:03 2014, Alfredo Estrade, IV curve with CAEN N1419 IV_dec14.PNG
Entry  Fri Jan 30 13:02:35 2015, Alfredo Estrade, [Data] R61 (207Bi source) and R62-R65 (pulser walk-through) 
ELOG V3.1.4-unknown