Wed Feb 24 10:25:35 2016, TD, Wednesday 24 February 2016   
|
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.770uA, ambient temperature +19.8 deg C
|
Tue Feb 23 12:16:08 2016, TD, Tuesday 23 February 2016
|
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.570uA, ambient temperature +19.8 deg C
|
Mon Feb 22 16:47:28 2016, PJCS, Version 8 in nnaida2 outputting and merging two streams
|
nnaida2 , the bare test FEE64 in T9, is successfully running with two streams connected to nndhcp177 ( a Linux64 computer )
Merge running on nndhcp177 is receiving the streams and merging them.
nnaida2 has a slow pulser , 100Hz , connected to one waveform input. |
Mon Feb 22 15:19:52 2016, PJCS, T9 System changed to version 8
|
I have changed the T9 system to be using Version 8.
Tests using the detector and pulser seem to be ok.
Transmission to the Merge and Merging operating ok |
Fri Feb 19 10:23:31 2016, TD, 19 February 2016
|
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.070uA, ambient temperature +20.2 deg C
|
Thu Feb 18 13:23:03 2016, TD, Report: high: MERGE error messages
|
During R30 ( see https://elog.ph.ed.ac.uk/AIDA/154 ) obtain the following merger error messages
(rate ~ 10 per minute) with merger rate ~100-200k data items/s
|
Thu Feb 18 10:23:48 2016, TD, Thursday 18 February 19x
|
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.200uA, ambient temperature +20.1 deg C
|
Wed Feb 17 11:54:50 2016, CG, TD, 17 February 2016 6x
|
File R17 -> pulser walkthrough.
- Started ~10.00
- Pulser peak amplitude taken from 9.0V to 1.0 V in 1.0V steps
|
Tue Feb 16 17:32:21 2016, CG, TD, 16 February 2016
|
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.150uA, ambient temperature +20.1 deg C
|
Wed Feb 10 10:56:02 2016, CG, TD, 9-10 February 2016 7x
|
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.540uA, ambient temperature +19.9 deg C
|
Tue Feb 9 17:27:12 2016, CG, TD, Ribbon cable + coupler tests at DL 8-9th Feb    
|
08/02/16
Spoke to PJC-S -> Ethernet cables from FEEs to switch are all 4m Cat6.
System powered on with bias to detector of +200V and leakage current of 6.4uA at room temp 19.0oC. |
Wed Feb 3 15:34:30 2016, CG, TD, Ribbon cable + coupler tests at DL 1st-2nd Feb
|
01/02/16
Started up system. Biased det to +200V |
Tue Feb 2 17:32:46 2016, CG, TD, Tuesday 2 February 2016 9x
|
Bias +200V, I_L +6.955uA, ambient temp +20.2 deg C
MSL type BB18(DS)-1000 2998-20
|
Tue Feb 2 14:08:44 2016, CG, TD, Report: Low - No SYNCs from FEEs
|
Currently running with a source, and everything seems to be running fine in terms of histograms doing what we expect, no error messages etc.
Tried to start the merger and tape server, but the merger reports as waiting for the first SYNC.
Checked the stats page and sure enough, no SYCs are being produced. |
Thu Jan 28 13:53:29 2016, CG, TD, Ribbon cable + coupler tests at DL - 25-26th Jan 15x
|
25/01/16
On start up, received error when trying to access spectrum browser (attachment 1) => required restart of 'Http for AIDA'
At 2us shaping time, and all other setting as last week, the situation remains the same |
Wed Jan 27 14:54:48 2016, TD, CG, Wednesday 27 January 2016 
|
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +8.110uA, ambient temperature +20.2 deg C
|
Wed Jan 20 17:02:47 2016, CG, TD, Ribbon cable + coupler tests at DL 17x
|
18/01/16
Set up as last week but with 8us shaping time.
With detector connected, still seeing rail-to-rail noise on waveforms in nnaida13 and double peaking in all nnaida. |
Wed Jan 20 16:44:02 2016, TD, Report - LOW - spectrum browser x/y expand
|
Spectrum Browser
|
Wed Jan 20 12:00:19 2016, CG, TD, Wednesday 20 January 2016 6x
|
11.58 Repeat yesterday's test - no significant change observed
nnaida11 - input -, shaping time 2us - attachment 1
|
Tue Jan 19 18:09:53 2016, CG, TD, Tuesday 19 january 2016   
|
18.00 Swapped input cables to nnaida11 and nnaida14
both cables LH coupler + 2x 34-way Samtec ribbon cables + 3M 1245 1.4mil Copper screen w/ground wire
|