AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA  ELOG logo
Message ID: 141     Entry time: Tue Jan 19 18:09:53 2016
Author: CG, TD 
Subject: Tuesday 19 january 2016 
18.00 Swapped input cables to nnaida11 and nnaida14
      both cables LH coupler + 2x 34-way Samtec ribbon cables + 3M 1245 1.4mil Copper screen w/ground wire
      RH coupler not fitted 
      both ground wires tied to BNC cable from pulser to AIDA adaptor PCBs at BNC(F)-Lemo-00(M) adaptor

      Before swap, input cable attached to nnaida11 exhibited typical peak widths ~50 ch FWHM, cable
      attached to nnaida  exhibited double peaking and other structure

      This is unchanged following swap => grounding and/or AIDA adaptor PCB significant *not* cable

      See attachments 1-4 post swap  
       nnaida11 ASIC 2*L ~40-60 ch FWHM pulser peak width
       standard ASIC settings, shaping time 2us
Attachment 1: 1.png  5.682 MB  | Hide | Hide all
1.png
Attachment 2: 2.png  5.682 MB  | Hide | Hide all
2.png
Attachment 3: 3.png  5.682 MB  | Hide | Hide all
3.png
Attachment 4: 4.png  5.682 MB  | Hide | Hide all
4.png
ELOG V3.1.4-unknown