AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 40 of 46  ELOG logo
Entry  Wed May 24 13:39:12 2017, Patrick Coleman-Smith, Examination of Console Logs -- and a couple of reminders 
I have tarred and zipped all 24 logs and shipped them back to the UK. Now I can browse through them.

Studying the "panics" :=

       nnaida17 has one which is an NFS mount failure.
    Reply  Wed May 24 14:51:06 2017, Patrick Coleman-Smith, Examination of Console Logs -- and a couple of reminders 
 




Quote:



I have tarred and zipped all 24 logs and
    Reply  Wed May 24 15:58:53 2017, Patrick Coleman-Smith, Examination of Console Logs -- and a couple of reminders 
 




Quote:



 
Entry  Sun Nov 27 12:30:41 2016, AE, PV, Energy loss in Degraders and Implantation for runs 1028 and 1033 6x
Implantation profile in AIDA

    BigRIPS file 1028 (Attachment run1028.png):  Degrader setting: 3 mm Pb(fix) + 0.8 mm W(variable) + 2 mm Al(variable)

    BigRIPS file 1033 (Attachment run1033.png):  Degrader setting: 3 mm Pb(fix) + 0.8 mm W(variable) + 2 mm Al(variable) + 1 mm
Entry  Wed Sep 10 09:27:43 2014, Patrick, Elog appreciation 
 This is very interesting. Look forward to many happy interactions.
Entry  Wed Jun 1 07:49:45 2016, TD, Detector noise - state of play 10x
Screenshots of ASIC#1 waveforms for each side of each of the DSSSD #1 - #6 are attached.

Standard ASIC settings - tau = 8us
Entry  Thu Nov 23 01:10:43 2017, TD, CB, Detector bias & leakage currents - October & November 2017 AIDA_leakage_current(16).xlsx
https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=282765719
Entry  Wed Mar 29 08:13:34 2017, DK, PV, JL, CG, Degrader, Pb wall opening 
16:21

Chris noticed that when the degraders that are at the beam right position when they are "out" may not be fully removed from the beamline.  It's difficult
Entry  Thu Apr 30 03:00:48 2015, TD, Degrader changes 

From 20.00 29.4.15
Entry  Thu Nov 10 11:57:35 2016, TD, Data directory NP1412 renamed as RIBF123R1 

Data directory NP1412 renamed as RIBF123R1
Entry  Sun Jun 18 06:35:22 2017, TD, DSSSD bias & leakage current spreadsheet AIDA_leakage_current(15).xlsx

https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit#gid=808110721
Entry  Thu Jun 21 06:48:22 2018, TD, OH, DSSSD HV cabling 50.png51.png
The DSSSD HV cabling has been changed in preparation for configuration change
from 6x DSSSDs to 8x DSSSDs as follows:
Entry  Sun Oct 5 22:42:56 2014, Chris Griffin, DL tests on 02/10/14 17x
 A late entry for the work I carried out on Thursday.
With the Emco box providing the HV, the pulser peak showed double (or triple) peaks. This was not seen with the SY1527 so I thought this would
be better for looking at peak widths.
Entry  Mon Nov 28 15:53:39 2016, AE, AT, RG, CG, DAQ synchronization  7x
We noticed a peculiar feature in the time-stamp synchronization monitor. The spectra of timestamp difference between pairs of DAQ systems show, for all
possible pair combinations, a peak at Delta(ts)= 65535 = 2**15

This corresponds to a difference of 2.6 ms (for 25MHz correlation clock). See the attachments taken ~23:00 of Nov 28th.
Entry  Tue Oct 18 06:56:52 2016, TD, DAQ status 

From the installation of the RG58 cable for the 50MHz TTL clock from BRIKEN DAQ
to AIDA Master MACB external clock input we observe DAQ stalls at c. 06.30 and
Entry  Wed Jun 8 09:29:55 2016, TD, DAQ state of play 9x

17.25 State of play
Entry  Fri May 19 10:16:27 2017, CB, TD, OH, DAQ sever rebooted 
18:16 Finished rebooting DAQ server and acquisition. All OK, except ADC calibration on #7.
      Started run May2017/R16
      ASIC settings 2017Mar27-16.12.39 *except*
Entry  Mon Feb 23 07:23:08 2015, J. Agramunt, H. Baba, A. Estrade, DAQ correlation test DAQcorrelation_diagram.pdfDAQsoftware.pdfcorrelation_25Hz.pngcorrelation_random.png
The attached figure shows the configuration used to test the synchronization of the DAQ systems using a
correlation scalar counted from a common clock signal (DAQcorrelation_diagram.pdf). 
Entry  Fri Jun 10 02:25:45 2016, TD, ML & YS, DAQ State of Play - Friday 10 June 2016 6x

10.25 Screenshots showing DAQ state of play during NP1512
Entry  Sun Sep 30 01:48:27 2018, OH, TD, Current link to Google sheets leakage current log 
https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit?pli=1#gid=282765719
ELOG V3.1.3-7933898