AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 45 of 46  ELOG logo
Entry  Wed Dec 3 12:13:03 2014, Alfredo Estrade, IV curve with CAEN N1419 IV_dec14.PNG
Measured IV curve for BB18 DSSD with new CAEN HV supply. Settings as in previous elog entry:

Detector bias CAEN N1419 Programmable HV Power Supply
Entry  Fri Jan 30 13:02:35 2015, Alfredo Estrade, [Data] R61 (207Bi source) and R62-R65 (pulser walk-through) 
Jan 22, 2015

R61: 207Bi source spectra accumulated during one afternoon. Same settings as in R49 (alpha background run, 
Entry  Fri Jan 30 15:27:35 2015, Alfredo Estrade, [Analysis] 207Bi source (R61): check of monitor spectra 7x

A first look at the data from the 207Bi source (run described in previous elog entry, ID 27)
Entry  Sat Dec 12 03:30:50 2015, Alfred, Chris, Phong, change configuration of NNAIDA modules in setup 
We want to reduce the configuration of the setup to 4 FEE cards (8 NNAIDA modules), so we only have to isolate 4 of them from the cooling crate for a
noise test. Following instructions in April2015 test logbook.
Copied directory /MIDAS@aidas to /MIDAS@aidas.121215
Entry  Tue May 31 16:03:24 2016, AE. VP, Co/Bi source run (R17) 8x
Set discriminator mask for DSSD2 through DSSD6 (see attachments). Fast comparator threshold set to 9 for all DSSDs.

New source run for beta-gamma correlation, now with all DSSDs included in EURICA trigger.
Entry  Wed May 11 06:00:56 2016, AE, VP, BM (Byul Moon), FEE64 <-> MACB trigger mapping dssd_layout.jpg
Here is the mapping of the trigger output of MAC-B modules to FEE64 modules

3.1   NNAIDA5   veto-X2
Entry  Wed May 11 06:01:16 2016, AE, VP, BM, Beta trigger Trigger_scheme-new.jpg
Please find attached the best diagram of the beta trigger logic circuit for EURICA campaign 2016
Entry  Wed May 11 06:37:32 2016, AE, VP, BM, Wednesday 11 May Eurica_timestamp.pngAIDA_timestamp.pngTimestamp_correlation_AIDA_EURICA.png
*2:30 pm*: changed power source of USB-controlled power supply for FEEs. Now one of the power cables is connected
to the 'B' power supply of F11, and the second to the 'C' power supply (these are in the unit on top of WASBI
crates). The reason for change is that before both were connected to 'C', and drained current was very close to
Entry  Thu May 12 16:55:37 2016, AE, VP, BM, Thursday May 12 7x
Continued work on beta-trigger for EURICA. However the system seems to have different noise condition than before, which 
we think appeared after we changed power source for FEE's PSU (https://elog.ph.ed.ac.uk/AIDA/220). This is high frequency 
noise of low amplitude, with a period of 10 usec.
Entry  Sat May 14 11:27:09 2016, AE, VP, [How To] DAQ correlation monitor (June16 campaign) sync2.pngsync3.pngsync5.pngsync6.png
The program for online monitoring the correlation of the DAQ systems (AIDA-EURICA-BigRIPS) through a common scaler is SyncCheck (J. 
Agramunt). 
Entry  Sat Jun 11 10:29:16 2016, AE, TD, LHB, synchronization between different FEEs AIDA10_20_pulser_allign.pngAIDA10_40_pulser_allign.pngAIDA34_puls_alignm.png
file AIDA10_20: stopped on June 10, 14:59
file AIDA10_40: stopped on June 10, 16:16
Entry  Sat Nov 26 09:17:42 2016, AE, TD, DK, Offline analysis of R9_24 rates_r9_24.pngee_r9_24.pngxy_r9_24.png

R9_24 3mm Pb + 0.3mm W (+1mm Al) + 1.0mm W (+1mm Al)

 

 *** data items:  261088000 (  99232.91 Hz)
 *** ADC events:   41690396 (  15845.46 Hz)
Entry  Sat Jun 10 09:24:45 2017, AE, TD, Saturday 19 June 16.00-24.00 24x
17.25 Detector biases & leakage currents OK - see attachments 1 & 2
      FEE64 Temperatures OK - see attachment 3
      good events statistics stable & OK - see attachment 4
Entry  Sun Nov 27 12:30:41 2016, AE, PV, Energy loss in Degraders and Implantation for runs 1028 and 1033 6x
Implantation profile in AIDA

    BigRIPS file 1028 (Attachment run1028.png):  Degrader setting: 3 mm Pb(fix) + 0.8 mm W(variable) + 2 mm Al(variable)

    BigRIPS file 1033 (Attachment run1033.png):  Degrader setting: 3 mm Pb(fix) + 0.8 mm W(variable) + 2 mm Al(variable) + 1 mm
Entry  Fri Jun 10 21:07:52 2016, AE, DK, TD, ML, MA, Saturday 11 June 2016 8x
04.51 Start run AIDA18.  Beam is back from the operators.
      Scalers are shown as attachment 1
      Leak currents seem okay (all < 5 uA), shown as attachments 2 and 3.
Entry  Tue Nov 29 19:07:35 2016, AE, CG, ATS, AT, F11 conditions after change to C target in F8 [light particles?] visual_scal_4am_Cin_F7.pngpid_r1093.pngimp_ch2.pngpid_ch2.pnghits_ch2.png
The main experiment changed to a carbon reaction target at F8 (similar thickness of CH2 previously used), and retuned the ZDS. First BigRIPS run after
retuning is 40Mg_1093 (at 2:29 am, Nov 30th)

The background at F11 has increased. The neutron backgroun incresead by a factor of ~10. The rates of visual scalers also increased; for example
Entry  Mon Dec 14 19:25:35 2015, AE, CG ,Phong, Merger/TapeServer trouble report master_no_data_transfer.pngmaster_no_data_transfer.pngerror_when_stop_daq_merger_running.pngerror_show_1_3_8_kaput.pngout_term.txt
Sat. 12/12/15

Working with a 8-FEE setup (as in https://elog.ph.ed.ac.uk/AIDA/133). We could open a file with the 
Entry  Tue Jul 14 18:06:54 2015, AE, CG, [Data Analysis] Correlation Scaler timestamp in PID data (go4_30**.root) 10x
The attached plots show the time-stamp data in the EURICA files with PID information (EventInfo.timestamp). The
timestamp value should correspond to the correlation scaler included as info_code==8 in AIDA. 
Entry  Mon Nov 28 15:53:39 2016, AE, AT, RG, CG, DAQ synchronization  7x
We noticed a peculiar feature in the time-stamp synchronization monitor. The spectra of timestamp difference between pairs of DAQ systems show, for all
possible pair combinations, a peak at Delta(ts)= 65535 = 2**15

This corresponds to a difference of 2.6 ms (for 25MHz correlation clock). See the attachments taken ~23:00 of Nov 28th.
Entry  Wed Apr 22 07:28:25 2015, AE (PM), Mechanical setup instructions: AIDA+EURICA at F11 AIDA_procedure_document.docx
Attached are Paul Morrall's instructions on how to move new AIDA support table into place, for a setup with 
EURICA at F11 (March 2015).
ELOG V3.1.3-7933898