|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
BRIKEN |
 |
|
Message ID: 110
Entry time: Sat Nov 5 01:25:24 2016
|
Author: |
Tain et al |
Subject: |
End of Beam Line Setup |
|
|
Some photos of the elements in the last part of the beam line
during Takechi run.
After the chamber that includes the F11 plastic detector
there are 2 GSI-MUSIC chambers.
In between the MUSIC chambers there is a sample changer
with 2 Carbon targets of 6mm and 3mm thickness and also
an empty position.
After the 2nd MUSIC there is a plastic detector for testing
(could be removed at any time)
Afterwards there is the degrader mounted on a separate table.
In the same table there is a 10cm thick lead wall
to protect AIDA during Takechi run.
Mounted on the shielding are from the beam side the top and bottom
plastic veto detectors.
On the back side the Si detector is mounted.
The hole in the shielding is covered with
a 2cm thick Al plate to protect AIDA during Takechi run.
Behind AIDA there is a thin plastic detector
to veto the passing through particles. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|