AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 126     Entry time: Mon Nov 7 06:55:01 2016
Author: NTB, SG 
Subject: HPGe Fill line to D4 replaced 

HPGe fill line to D4 replaced only small leak (overflow) once Ge is full.

Solenoid was also wrapped to no effect. AIDA DAQ still stops writing.

Boron sheet and extra polyethylene were placed back on top.

 

 

ELOG V3.1.4-unknown