AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  BRIKEN  ELOG logo
Entry  Mon Nov 7 06:55:01 2016, NTB, SG, HPGe Fill line to D4 replaced 
This is a draft message, edit and submit it to make it permanent  
Message ID: 420     Entry time: Fri Mar 27 23:15:38 2026     In reply to: 126
Author: NTB, SG 
Subject: HPGe Fill line to D4 replaced 

 

Quote:

HPGe fill line to D4 replaced only small leak (overflow) once Ge is full.

Solenoid was also wrapped to no effect. AIDA DAQ still stops writing.

Boron sheet and extra polyethylene were placed back on top.

 

 

 

ELOG V3.1.3-7933898