11:07 New acquisition is started for tungsten degraders
1mm W + 1mm Al
0.5mm W + 1mm Al
3mm Pb (fixed on the beam)
11:14 Online is saved and then cleared
file: 161126_1107_001_1114.root
Rates:
F11R : 10.5Hz
BRIKEN : 170 Hz
11:18 Tungsten degraders are removed.
11:20 Beam Off
11:30 Beam ON
OBS: Something happens in between with the beam intensity!!!
Rates:
F11R : 10.5Hz && 4.54 Hz
BRIKEN : 177.7 Hz && 160 Hz
11:41 Beam OFF
11:55 Acquisition is stopped. Files
161126_1107_001.dlt (full run)
161126_1107_001.root (Online from 11:18) |