======= START =======
Date 2016/11/26
Start time : 20:05
BRIKEN run : 020
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161126_2004_
AIDA run : R10-0
AIDA start : 20:05
BigRIPS run : 40Mg-1011
BigRIPS start : 19:30
---------------------------
Shifters: AT&AT, AE, GK
======= Setup =======
Central fragment: 41Al
--- Degraders ---
Fixed: 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. OUT
2. IN
3. IN
======= COMMENTS =======
2016/11/27
02:48 Beam Off for a while.
07:15 Two peaks appeared in the syncMonitor for Ribf-AIDA. It was after the refilling of Liquid Ni. Not clear if
the possible sync problem affected the measurements.
07:20 Beam OFF
------ Rates ------
BRIKEN : 1.90963e+02 Hz
F11R : 9.75134 Hz
Clovers : 2.03958e+02 Hz
VPLT : 1.87119e+01 Hz
VPLB : 7.76665 Hz
AIDAPL : 1.00896e+01 Hz
========= END =========
Date 2016/11/27
BRIKEN run : 023
BRIKEN stop : 06:25
ROOT online : 161126_2004_020_023.root
AIDA run : R10-211
AIDA stop : 06:25
BigRIPS RUN : 1022 |