======= START =======
Date 2016/11/27
Start time : 16:20
BRIKEN run : 032
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161127_1620
AIDA run : R21_0
AIDA start : 16:19
BigRIPS run : 40Mg-1032
BigRIPS start : 16:20
---------------------------
Shifters: PV, TD, GK
======= Setup =======
Central fragment: 40Mg
--- Degraders ---
Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
2016/11/27
~16:10: Beam Off for a while, we entered F11 area and attached 1mm Al degrader to the beam hole in BRIKEN PE
shielding, then start the new run
~17:00: AIDA merger stopped
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB : Hz
AIDAPL : Hz
========= END =========
Date 2016/11/27
BRIKEN run : 032
BRIKEN stop : 17:15
ROOT online :
AIDA run : R21_8
AIDA stop : 17:04
BigRIPS RUN : 1032 |