AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 184     Entry time: Sun Nov 27 11:23:54 2016
Author: PV, GK, AE, TD  
Subject: 40Mg. Run 35  
=======    START    =======
Date 2016/11/27
Start time	: 18:59
BRIKEN run	: 035
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1859
AIDA run	: R23_0
AIDA start	: 19:19
BigRIPS run	: 40Mg-1034
BigRIPS start	: 18:33
 
---------------------------
Shifters:  PV, AE, GK, TD
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

2016/11/27
19:19: There is a transient, AIDA DAQ found stopped due the incompleted LN2 filling.

------  Rates  ------
BRIKEN	:   Hz
F11R	:   Hz
Clovers	:   Hz
VPLT	:   Hz
VPLB	:   Hz
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 035
BRIKEN stop	: 19:23
ROOT online	: 
AIDA run	: R23_4
AIDA stop	: 19:19
BigRIPS RUN	: 1034
ELOG V3.1.4-unknown