======= START =======
Date 2016/11/27
Start time : 18:59
BRIKEN run : 035
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161127_1859
AIDA run : R23_0
AIDA start : 19:19
BigRIPS run : 40Mg-1034
BigRIPS start : 18:33
---------------------------
Shifters: PV, AE, GK, TD
======= Setup =======
Central fragment: 40Mg
--- Degraders ---
Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
2016/11/27
19:19: There is a transient, AIDA DAQ found stopped due the incompleted LN2 filling.
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB : Hz
AIDAPL : Hz
========= END =========
Date 2016/11/27
BRIKEN run : 035
BRIKEN stop : 19:23
ROOT online :
AIDA run : R23_4
AIDA stop : 19:19
BigRIPS RUN : 1034 |