AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 187     Entry time: Mon Nov 28 05:59:28 2016
Author: briken  
Subject: run 
=======    START    =======
Date 2016/11/28
Start time	: 11:12
BRIKEN run	: 056
Daq Conf. File	: 161128Conf_BrikenFull.xlsx
DLT File name	: 161128_1112
AIDA run	: R28-0
AIDA start	: 11:08
BigRIPS run	: 1049
BigRIPS start	: 09:15
 
---------------------------
Shifters:  AT GK KD
=======    Setup    =======
Central fragment:  41Al @F8
--- Degraders ---
 Fixed: 3mm Pb between Musics chambers
 Included lead shieldings around the beam.
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. OUT
2. IN
3. IN

=======  COMMENTS   =======
09:13 Clover G7Red Plugged in again. 

AIDAPL gain has been increased by SN from 900V to 1000V.

------  Rates  ------
BRIKEN	:     Hz
F11R	:     Hz
Clovers	:     Hz
VPLT	:     Hz
VPLB	:     Hz
AIDAPL	:     Hz

=========   END   =========
Date 2016/11/28
BRIKEN run	: 
BRIKEN stop	: 
ROOT online	: 
AIDA run	: 
AIDA stop	: 
BigRIPS RUN	: 
ELOG V3.1.4-unknown