|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
BRIKEN |
 |
|
Message ID: 194
Entry time: Thu Mar 23 09:04:38 2017
|
Author: |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura |
Subject: |
Remove EURICA rails |
|
|
We remove partially the floor rails of EURICA
to proof that it is possible to move BRIKEN + AIDA.
See attached photographs of the present status.
This will allow eventually to move both detectors by about
1 meter to have a better focus at the implantation position.
This movement could be done with a minimum of cable disconnection
using the wheels of both support tables. |
|
|
|
|
|
|