AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 194     Entry time: Thu Mar 23 09:04:38 2017
Author: JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura 
Subject: Remove EURICA rails 
We remove partially the floor rails of EURICA 
to proof that it is possible to move BRIKEN + AIDA.

See attached photographs of the present status.
This will allow eventually to move both detectors by about
1 meter to have a better focus at the implantation position.
This movement could be done with a minimum of cable disconnection
using the wheels of both support tables.
Attachment 1: Donwstream-EURICA-Rail.jpg  385 kB  Uploaded Thu Mar 23 10:15:00 2017  | Hide | Hide all
Donwstream-EURICA-Rail.jpg
Attachment 2: Upstream-EURICA-Rail.jpg  351 kB  Uploaded Thu Mar 23 10:15:34 2017  | Hide | Hide all
Upstream-EURICA-Rail.jpg
Attachment 3: GeneralView.jpg  512 kB  Uploaded Thu Mar 23 10:15:59 2017  | Hide | Hide all
GeneralView.jpg
ELOG V3.1.4-unknown