AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 286     Entry time: Sat Apr 1 21:37:42 2017
Author: YS, Liu, CG 
Subject: 37Na run 71 
Date: 2/04/2017 
Start:04:47
BRIKEN run: 71
AIDA Run: R20_410
BigRIPS run: 227

DLT:170402_0447_Na37_071.dlt

BRIKEN Rate: 1.6 cps 
F11 Rate: 8. cps 

Date: 2/04/2017 
Stop: 05:29
BRIKEN run: 71
AIDA Run: R20_420
BigRIPS run: 227

Root file:
OBSERVATIONS: The beam with this setting is finished and the BigRIPS team starts calibration runs. The beam will
not be delivered to ZDS.
ELOG V3.1.4-unknown