We observed 6 pm LN2 filling of both clovers on Monday Nov 5th.
D4 went full within reasonable time of below 10 minutes.
Filling of G7 was stopped by "emergency sensor" after about 15 minutes of filling.
Likely the temp sensor at the LN2 overflow pipe of G7 should be changed.
The clock at LN2 fill system is off by about 25 minutes (filling comes later than set at the control unit.)
|