AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 44     Entry time: Tue Jul 19 11:54:03 2016
Author: JL Tain A Tolosa R. Caballero A. Tarifeņo J. Agramunt  
Subject: Photos of the AIDA insertion hole with the 3He tubes 
RIKEN tubes on the AIDA side with the SHV right angle connector will protrude
by ~95mm in the HYBRID configuration (with CLOVERS). 
In the current AIDA DSSD configuration there are six detectors occupying 45-50mm 
at a distance to center of the stack from the black plastic support of ~430mm.
The hole for the CLOVER is 110mm. The center of the hole is at 375mm from the
PE end. 
This means that the center of the current stack is only ~15mm beyond the PE
in the CLOVER hole, so 1 or 2 of the DSSD will be partially shadowed
from the CLOVER detectors. 
(This do not represent any problem from the neutron detector point of view)
Attachment 1: DSC_2520.JPG  3.982 MB  | Hide | Hide all
DSC_2520.JPG
Attachment 2: DSC_2517.JPG  3.298 MB  | Hide | Hide all
DSC_2517.JPG
Attachment 3: DSC_2515.JPG  3.665 MB  | Hide | Hide all
DSC_2515.JPG
ELOG V3.1.4-unknown