Message ID: 63     Entry time: Thu Oct 6 02:03:32 2016
Author: JL Tain 
Subject: START 
We started the assembly of BRIKEN and AIDA detectors in their final position
on Tuesday October 4:

Gabor Kiss, Phong Vi, Keishi Matsui, Shunji Nishimura, Shigeru Kubono, PA,
Chris Griffin, Tom Davinson, Nathan Brewster, Shintaro Go, Daniel Stracener,
Ariel Tarifeno, Jorge Agramunt, Alvaro Tolosa, Jose L Tain

Tubes were removed from BRIKEN. PE matrix lifted with crane.
Table rotated and placed in the final position (front wheels 
between forward EURICA rails) by hand. Table leveled (height, angle)
with the help of laser. PE matrix placed back.
AIDA rotated and adjusted to BRIKEN by hand.

See photos
Attachment 1: BRIKEN-AIDA.jpg  2.150 MB  Uploaded Sat Oct 8 01:53:02 2016  | Hide | Hide all
BRIKEN-AIDA.jpg
Attachment 2: BRIKENfront.jpg  1.876 MB  Uploaded Sat Oct 8 01:55:33 2016  | Hide | Hide all
BRIKENfront.jpg
Attachment 3: AIDAback.jpg  2.110 MB  Uploaded Sat Oct 8 01:58:13 2016  | Hide | Hide all
AIDAback.jpg
Attachment 4: AIDAintoBRIKEN.jpg  1.601 MB  Uploaded Sat Oct 8 01:59:25 2016  | Hide | Hide all
AIDAintoBRIKEN.jpg
Attachment 5: AIDAnosefront.jpg  1.807 MB  Uploaded Sat Oct 8 02:00:43 2016  | Hide | Hide all
AIDAnosefront.jpg
Attachment 6: AIDA-CLOVERhole.jpg  1.353 MB  Uploaded Sat Oct 8 02:02:01 2016  | Hide | Hide all
AIDA-CLOVERhole.jpg