AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 81     Entry time: Thu Oct 13 12:58:31 2016
Author: JL Tain et al 
Subject: INCIDENT 
NIM Crate Failure. Lost of CLOVER G7

One of the 2 NIM crates, the one containing the power for CLOVER
preamps went kaputt.
As a consequence the preamp of CLOVER detector G7 was damaged:
G7 was removed
ELOG V3.1.4-unknown