Friday, October 14, 2016 21:50
AIDA and BRIKEN-CLOVER run with a common clock.
After installing the shielding and checking electronics
(See next entry)
252Cf source 7.5cm from the center.
AIDA nose aligned with the edge of the clovers hole.
start: 21:50 run number: BRIKEN:15 AIDA:0
stop : 22:18 run number: BRIKEN:16 AIDA:9
BRIKEN dlt file:252CfWithAida75mmcenter_15 to _16
AIDA file: aidas1:/TapeDate/Sept2016/R41_0 to _9
Online analyzed data around 30%
Online spec: 252CfWithAida75mmcenter_15_16.root
Configuration file attached. |