AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 13 of 21  ELOG logo
ID Date Authordown Subject
  210   Wed Mar 29 13:31:37 2017 J Agramunt, R. Caballero, T. Davinson, C. Griffin, O. Hall, D. Kahl, G. Kiss, J. Liu, S. Nishimura, V. Phong, JL TainStart of parasitic
Start of parasitic Ca beam
(main experiment "New isotope search", Ahn et al.)

New directory: /data/1703Ahn/

Configuration file: 170329_Conf_BrikenFull.xlsx
  104   Thu Nov 3 05:46:48 2016 Iris, AleBackground measurement
Background measurement for threshold determination



Started at 14:45
Stopped: 16:35

Root file: 161103_1635_bck.root
  321   Mon Jun 12 02:45:44 2017 Iris Dillmann ATSetup detectors. Id of Ancillary@BRIKEN
Attachment 1: Setup detectors 
Attachment 2: example of configuration file (valid only for RIBF127). The Id of the ancillary detectors are:

DTPulser        95 
 
V_PL_T          96
 
V_PL_B          97
 
F11_PL_R_LG     98 
 
F11_PL_L_LG     99 
 
V_NaI_R         100
 
V_NaI_L         101
 
F11_PL_R        102
 
F11_PL_L        103

Si_T            104
 
Si_B            105
 
AIDA_PL         106
  128   Mon Nov 7 09:05:09 2016 IrisDraft for Run sheet
Attached is the draft for the paper run sheet (version 2). If something is missing, please let me know.
  146   Wed Nov 9 01:02:53 2016 IrisElog
From Nov. 9th on we use the Takechi ELOG for the run information:
http://ribf-exp.riken.jp/elog/RIBF123/ 
  Draft   Wed Nov 9 01:04:35 2016 IrisDrawing of present setup
This is the setup which was used for the Ni runs (from Nov. 8th evening on).

Note (Nov. 10th): Alejandro built a U-shaped Pb wall, the degrader inside AIDA was removed and possibly a Al plate was installed. This has to be checked when access is possible again.


> Attached is the present setup including all walls, auxiliary detectors, degraders etc. and the Takechi setup.
> The lead wall will be removed for measurements (of course...).
> Not to scale! Some sizes and distances included. Pictures see Jose's entry ID 110.
> 
> Note the shape of the active area of the DeltaE Silicon detector, see previous entry.
  148   Wed Nov 9 02:02:22 2016 IrisBoron rubber from India
The boron rubber from India is BR-2871, price US-$ 2700 for 2pc 1m x 2m x 3.3mm.
52% B content, density 1.61 g/cm3
  247   Fri Mar 31 04:57:01 2017 ID,YS,JLT,OH40Mg run 35
Date: 31/03/2017
Start: 12:24
BRIKEN run: 035
AIDA Run: R16_536
BigRIPS run: 178
DLT: 170331_1224_Mg40_035.dlt

BRIKEN Rate:  4 cps
F11 Rate: 13 cps


Date: 31/03/2017
Stop: 1324
BRIKEN run: 035
AIDA Run: R16_551
BigRIPS run: 178

Root file: 170331_1222_1324_B035_Mg40.root

OBSERVATIONS: Online cleared
  273   Sat Apr 1 06:49:00 2017 ID,GK,JA,DK,SN,JLT37Na run 58
Date: 1/04/2017
Start:14:48
BRIKEN run: 58
AIDA Run: R20_203
BigRIPS run: 212
DLT:170401_1448_Na37_058.dlt


BRIKEN Rate: 1.5 cps
F11 Rate: 8.5 cps

Date: 1/04/2017
Stop: 16:37
BRIKEN run:  58
AIDA Run: R20_232
BigRIPS run: 213

Root file: 170401_0157_1637_B058_Na37Ne36.root

OBSERVATIONS:
We change in the online histograms (not on the configuration file) the range of F11_PL_R,L, _HG,LG, F11RgateSiT
and the gain of F11_PL_R,l_HG,LG
15:18 No beam. Continued running.
15:23 New BigRIPS file 213
16:14 No beam. RF problems. Continued running.
  243   Fri Mar 31 01:50:15 2017 ID, RCF40Mg Run 032
Date: 31/03/2017
Start: 10:01
BRIKEN run: 032
AIDA Run: R16_502
BigRIPS run: 175
DLT:170331_1001_Mg40_032.dlt

BRIKEN Rate: 4cps
F11 Rate: 11


Date: 31/03/2017
Stop: 10:22
BRIKEN run:032 
AIDA Run: R16_506
BigRIPS run: 176(beginning)

Root file:170331_0012_1022_B032_Mg40.root

OBSERVATIONS:
  267   Fri Mar 31 23:41:57 2017 ID, LIU, DK, GK37Na run 53
Date: 1/04/2017
Start: 07:41
BRIKEN run: 53
AIDA Run: R20_94
BigRIPS run: 205
DLT: 170401_0741_Na37_053.dlt

BRIKEN Rate: 1.5 cps
F11 Rate: 8.5 cps

Date: 1/04/2017
Stop: 09:01
BRIKEN run: 53
AIDA Run: R20_115
BigRIPS run: 205

Root file: 170401_0157_0901_B053_Na37Ne36.root

OBSERVATIONS: PPAC discharges every ~10min (got better)
  288   Sat Apr 1 22:41:22 2017 ID, GK, SN, Liu YS JLT38Mg run 73
Date: 2/04/2017 
Start: 06:37
BRIKEN run: 73
AIDA Run: R21_0
BigRIPS run: 237

DLT:170402_0637_38Mg_073.dlt

BRIKEN Rate: 5 -> 90 cps 
F11 Rate: 30 -> 350 cps 

Date: 2/04/2017 
Stop: 08:06
BRIKEN run: 73
AIDA Run: r21_22
BigRIPS run: 251

Root file:170402_0637_0806_B073_Mg38.root

OBSERVATIONS: 
Playing with degraders
Final degrader: 23mm
New BigRIPS run 238 started at 6:46 (38Mg beam attenuated by 1/8) -> very few counts in Si
New run 239-240 started at 7:03 (38Mg beam attenuated 1/2 narrow slit)-> we see more counts in the Si
run 241-242 atarted at 7:09 (38Mg 70% narrow slit)
run 243-244 at 7:16 (38Mg 5000enA)
run 245-246 at 7:23 (38Mg beam intensity 0.8)
run 247-248 at 7:32 (38Mg beam intensity 0.9)
run 249-250 at 7:38 (38Mg full beam)
run 251 at 7:41 (38Mg yield measurement)
  242   Fri Mar 31 01:01:58 2017 ID RCF OHRun 031
Date: 31/03/2017
Start: 08:58
BRIKEN run: 31
AIDA Run: R16_485
BigRIPS run: 174
DLT:170331_0858_Mg40_031.dlt

BRIKEN Rate:3.5cps
F11 Rate:11


Date:  31/03/2017
Stop: 09:44
BRIKEN run: 31
AIDA Run: R16_498
BigRIPS run: 174

Root file:170331_0012_0944_B031_Mg40.root
OBSERVATIONS:
Beam stopped at 9:44 to change the C foil
  244   Fri Mar 31 02:26:19 2017 ID RCF40Mg Run 033
Date: 31/03/2017
Start: 10:23
BRIKEN run: 033
AIDA Run: R16_507
BigRIPS run: 176
DLT:170331_1023_Mg40_033.dlt

BRIKEN Rate: 4 cps
F11 Rate: 10 cps


Date: 31/03/2017
Stop: 11:22
BRIKEN run: 033
AIDA Run: R16_521
BigRIPS run: 176

Root file:170331_0012_1123_B033_Mg40.root

OBSERVATIONS: We started dividing he count rates by factor 10 (clock = 10 Hz) a few runs ago. Please check this.
Night shift has used the count rates directly from the plots.
  253   Fri Mar 31 11:46:44 2017 ID PV CG40Mg Run 041
Date: 31/03/2017
Start: 19:43
BRIKEN run: 41
AIDA Run: R16_647
BigRIPS run: 186
DLT: 170331_1943_Mg40_041.dlt

BRIKEN Rate: 40/ 10= 4  cps
F11 Rate:  12 cps

Date: 31/03/2017
Stop: 20:45
BRIKEN run: 41
AIDA Run: R16_662
BigRIPS run: 186

Root file: 170331_1943_2045_B040_Mg40.root

OBSERVATIONS:
  245   Fri Mar 31 03:26:53 2017 ID OH SN40Mg Run 034
Date: 31/03/2017
Start: 11:23
BRIKEN run: 034
AIDA Run: R16_521
BigRIPS run: 177
DLT:170331_1123_Mg40_034.dlt

BRIKEN Rate:  4 cps
F11 Rate: 13 cps


Date: 31/03/2017
Stop: 12:24
BRIKEN run: 034
AIDA Run: R16_536
BigRIPS run: 177

Root file:170331_1123_1222_B034_Mg40.root

OBSERVATIONS: We started dividing he count rates by factor 10 (clock = 10 Hz) a few runs ago. Please check this.
Night shift has used the count rates directly from the plots.
  274   Sat Apr 1 08:39:47 2017 ID OH JLT36Ne 37Na run 059
Date: 1/04/2017
Start:16:38
BRIKEN run: 59
AIDA Run: R20_232
BigRIPS run: 214
DLT:170401_1638_Na37_059.dlt

BRIKEN Rate: 1.5 cps
F11 Rate: 8.5 cps

Date: 1/04/2017
Stop: 17:39
BRIKEN run:  59
AIDA Run: R20_247
BigRIPS run: 0214

Root file: 170401_0157_1739_B059_Na37Ne36.root

OBSERVATIONS:
  246   Fri Mar 31 03:54:26 2017 ID JLTRun 034: gamma spectra background lines
There is a strong background line at ~1293 keV. According to the attached document this could come from the
neutron activation of 115In to 116In (14s halflife) of Indium seals.
  289   Sun Apr 2 00:19:01 2017 ID JA GK CG YS SN Liu VP 39Al run 74
Date: 2/04/2017 
Start: 08:17
BRIKEN run: 74
AIDA Run: R21_23
BigRIPS run: 252

DLT:170402_0817_39Al_074.dlt

BRIKEN Rate: 48 cps 
F11 Rate: 320 cps 

Date: 2/04/2017 
Stop:08:20
BRIKEN run: 74
AIDA Run: r21_23
BigRIPS run: 252

Root file:170402_0817_0820_B074_Al39.root

OBSERVATIONS: 
  290   Sun Apr 2 00:44:01 2017 ID JA GK CG VP Liu JLT39Al run 75
Date: 2/04/2017 
Start: 08:42
BRIKEN run: 75
AIDA Run: R24_0
BigRIPS run: 254

DLT:170402_0842_39Al_075.dlt

BRIKEN Rate: 1 cps 
F11 Rate: 12 cps 

Date: 2/04/2017 
Stop:09:00
BRIKEN run: 75
AIDA Run: r24_4
BigRIPS run: 254

Root file:170402_0842_0900_B075_Al39.root

OBSERVATIONS:
ELOG V3.1.3-7933898