AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Entry  Tue Nov 8 06:13:11 2016, Tain et al, New plastic detector in F11 PlasticsBehinMUSIC1.jpgPlasticsBehindMUSIC2.jpg
    Reply  Tue Nov 8 06:39:25 2016, Tain. Iris, Drawing of present setup Full_BRIKEN_Setup-includingTakechi.pdf
This is a draft message, edit and submit it to make it permanent  
Message ID: 147     Entry time: Wed Nov 9 01:04:35 2016     In reply to: 136
Author: Iris 
Subject: Drawing of present setup 
This is the setup which was used for the Ni runs (from Nov. 8th evening on).

Note (Nov. 10th): Alejandro built a U-shaped Pb wall, the degrader inside AIDA was removed and possibly a Al plate was installed. This has to be checked when access is possible again.


> Attached is the present setup including all walls, auxiliary detectors, degraders etc. and the Takechi setup.
> The lead wall will be removed for measurements (of course...).
> Not to scale! Some sizes and distances included. Pictures see Jose's entry ID 110.
> 
> Note the shape of the active area of the DeltaE Silicon detector, see previous entry.
Attachment 1: Setup-161109-Takechi.pdf  407 kB  | Hide | Hide all
Setup-161109-Takechi.pdf
ELOG V3.1.4-unknown