AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 13 of 21  ELOG logo
Entry  Fri Nov 25 21:47:05 2016, AT, Background Beam OFF 161125_1617_017_BRIKEN.svg161125_1617_017_RateBRIKEN.svg
16:17  Background beam OFF

16:27 Beam On. Acquisition stopped just after beam ON. File:
Entry  Fri Nov 25 21:49:36 2016, AT, Background Beam OFF 
21:27  Beam off. Background is started.

22:10  Acquisition is stopped. Files:
Entry  Wed Jul 20 11:49:00 2016, J.L. Tain, J. Agramunt, R. Baeturia, A. Tarifeņo, A. Tolosa, ..., Background 160718_FullBrikenFirstData_bkg.zip
18/07/2016 
First background measurement overnight.
Entry  Wed Jul 20 17:05:59 2016, J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, ..., Background Bkg-with95tubes.png
Background measurement with remaining tubes (95) overnight

Listmode: 160719_2343_Bkg_*.dlt, Run: 031-044
Entry  Fri Oct 7 08:09:47 2016, JLTain et al, Background Bckg-1st.pdf161007_1045_bck.pdf
Background measurement overnight
Start: Oct-6 2242 Stop: Oct-7 10:45
Entry  Wed Oct 12 03:47:14 2016, JL Tain et al, Background 
Background measurement over night with CLOVER and VETO detectors

ADC #7 added to crate 1 for veto detectors: V1A7
Entry  Thu Oct 13 23:42:27 2016, JL Tain et al, Background Bckg-161014.pdf
Background measurement overnight

Start: 01:17
Entry  Mon Nov 7 13:15:07 2016, Alvaro, Ale, Jorge, Jose, Background 161108_0751_Overnight_BRIKEN.pdf
Background measurement overnight.

Start: 23:27 (07/11/2016)
Entry  Fri Mar 24 03:28:39 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, Background 170324_1040_BackgroundOvernight.pdf
Background measurement overnight

Start: 19:45
Entry  Sat Mar 25 13:42:23 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, R. Caballero, Background 170325_2224_Background.pdf
BRIKEN system powered and DACQ started after movement.
All looks fine.
Entry  Mon Mar 27 03:50:13 2017, JLT JA CG OH DK TD RC VP SN, Background 170327_1640_Background.pdf
Background measurement while they play with the beam.

Start: 11:40
Entry  Sun Apr 2 01:04:24 2017, JLT ID JA GK CG VP YS Liu, Background 
Date: 2/04/2017 
Start: 09:05
BRIKEN run: 76
Entry  Fri May 26 14:42:12 2017, JL, AT, Background 
Background measurement (no AIDA)

Entry  Thu Oct 25 16:04:17 2018, ATS & JLT, Background 
Background BRIKEN control measurement
No DLT
Entry  Fri Oct 26 03:24:25 2018, ATS & JLT, Background 
Background BRIKEN control measurement
No DLT
Entry  Fri Oct 26 03:57:37 2018, ATS & JLT, Background 
Background BRIKEN control measurement
No DLT
Entry  Sun Oct 28 07:41:03 2018, AT, JA, AA, Background 
Dacq was reinitialized
Background was measurement
Pulser: YES
Entry  Mon Oct 29 12:08:12 2018, JR, JA, AT, Background 

Background was measurement
Pulser: NO
Entry  Sat Mar 25 13:33:12 2017, JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, R. Caballero, BRIKEN+AIDA relocated NewLocation1.jpgNewLocation2.jpg
We moved AIDA+BRIKEN by 107cm upstream.
See attached photos.
Entry  Thu Nov 3 15:09:52 2016, A. Tarifeno-Saldivia, C. Domingo-Pardo, J.L. Tain, BRIKEN neutron efficiency BRIKEN_hybrid140.svgEfficiency_vs_Energy_HybridConf_140b.svgBRIKEN_hybrid140_efficiency.xlsx
Geant4 BRIKEN Neutron efficiency calculations as a function of neutron energy and for some spectra: Ga84-vandle, Br88-endf71, Rb94-endf71, Rb95-endf71,
I137-endf71, Cf252-MCNPX
  
ELOG V3.1.3-7933898