ID |
Date |
Author |
Subject |
164
|
Fri Nov 25 21:47:05 2016 |
AT | Background Beam OFF |
16:17 Background beam OFF
16:27 Beam On. Acquisition stopped just after beam ON. File:
161125_1617_017.dlt
161125_1617_017.root
BRIKEN rate beam OFF (background): 0.34 +- 0.03 n/s |
Attachment 1: 161125_1617_017_BRIKEN.svg
|
|
Attachment 2: 161125_1617_017_RateBRIKEN.svg
|
|
166
|
Fri Nov 25 21:49:36 2016 |
AT | Background Beam OFF |
21:27 Beam off. Background is started.
22:10 Acquisition is stopped. Files: |
49
|
Wed Jul 20 11:49:00 2016 |
J.L. Tain, J. Agramunt, R. Baeturia, A. Tarifeņo, A. Tolosa, ... | Background |
18/07/2016
First background measurement overnight.
START: 23:37
File: 160718_FullBrikenFirstData_bkg_*.dlt Run:003-006
Online: 160718_FullBrikenFirstData_bkg.root
Attached screenshots of raw data for every digitizer.
The problem of some of the PA is visible in the background
spectra.
In addition one can see in some of the channels signals
distributed over all the region up to the pulser and beyond.
This we found to be related to a too low threshold
but can be eliminated with a better adjustment. |
Attachment 1: 160718_FullBrikenFirstData_bkg.zip
|
56
|
Wed Jul 20 17:05:59 2016 |
J.L. Tain, J. Agramunt, A. Tarifeņo, A. Tolosa, ... | Background |
Background measurement with remaining tubes (95) overnight
Listmode: 160719_2343_Bkg_*.dlt, Run: 031-044
Online: 160719_2343_1030_Bkg.root
Unfortunately the 252Cf source remained ind the hall (shielded and far away but still)
Screen shot of neutron spectrum |
Attachment 1: Bkg-with95tubes.png
|
|
66
|
Fri Oct 7 08:09:47 2016 |
JLTain et al | Background |
Background measurement overnight
Start: Oct-6 2242 Stop: Oct-7 10:45
file: 161007_1045_bck.root
See attached figure.
We see that low amplitude noise overlaps with the neutron spectrum.
We also see the grass-like background which extends all the way
up to the ADC range. |
Attachment 1: Bckg-1st.pdf
|
|
Attachment 2: 161007_1045_bck.pdf
|
|
77
|
Wed Oct 12 03:47:14 2016 |
JL Tain et al | Background |
Background measurement over night with CLOVER and VETO detectors
ADC #7 added to crate 1 for veto detectors: V1A7
VETO detectors HV off!
Start: 23:45
Stop: 10:56
File: 161012_1056_bck_noise.root
We see a very strong noise in the BRIKEN spectrum!!!
After some work we find that this was a problem
with configuration file: when editing the file
we put the calibration sheet at the beginning this
provoked a mixing of CLOVER and 3He spectra. |
85
|
Thu Oct 13 23:42:27 2016 |
JL Tain et al | Background |
Background measurement overnight
Start: 01:17
Stop: 10:35
File: 161014_1035_bck.root
See figure |
Attachment 1: Bckg-161014.pdf
|
|
130
|
Mon Nov 7 13:15:07 2016 |
Alvaro, Ale, Jorge, Jose | Background |
Background measurement overnight.
Start: 23:27 (07/11/2016)
Stop: 07:52 (08/11/2016)
ROOT file: 161108_0751_Overnight.root
The spectra have a terrible aspect!
This is consequence of DACQ crashing because LN2 filling! |
Attachment 1: 161108_0751_Overnight_BRIKEN.pdf
|
|
198
|
Fri Mar 24 03:28:39 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura | Background |
Background measurement overnight
Start: 19:45
Stop: 10:40
File: 170324_1040_BackgroundOvernight.root |
Attachment 1: 170324_1040_BackgroundOvernight.pdf
|
|
200
|
Sat Mar 25 13:42:23 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, R. Caballero | Background |
BRIKEN system powered and DACQ started after movement.
All looks fine.
Background measurement:
Start: aprox 12:00
Stop: 22:24
File: 170325_2224_Background.root |
Attachment 1: 170325_2224_Background.pdf
|
|
201
|
Mon Mar 27 03:50:13 2017 |
JLT JA CG OH DK TD RC VP SN | Background |
Background measurement while they play with the beam.
Start: 11:40
Stop: 16:40
File: 170327_1640_Background.root
There seems to be a second component of noise or background
above 50keV which was not there yesterday.
Beam related? |
Attachment 1: 170327_1640_Background.pdf
|
|
291
|
Sun Apr 2 01:04:24 2017 |
JLT ID JA GK CG VP YS Liu | Background |
Date: 2/04/2017
Start: 09:05
BRIKEN run: 76
DLT:170402_0905_Background_076.dlt
BRIKEN Rate: 1 cps
F11 Rate: 12 cps
Date: 3/04/2017
Stop:00:15
BRIKEN run: 78
Root file:170403_0905_0015_B076_B078_Background.root
OBSERVATIONS: AIDA was moved out at about 13:00 |
311
|
Fri May 26 14:42:12 2017 |
JL, AT | Background |
Background measurement (no AIDA)
Configuration file: 170526_Conf_BrikenFull.xlsx
Start: 26th-May, at 22:51
Stop: 27th-May, at 09:54
DLT: 170526_2251_bck_noAIDA_019.dlt
RUN: 019-020
RootFile:170526_2251_0954_bck_noAIDA.root
Comments: run 018 was dummy (time reset needed) |
393
|
Thu Oct 25 16:04:17 2018 |
ATS & JLT | Background |
Background BRIKEN control measurement
No DLT
2018/10/26
Start: 00:03
Stop: 09:46
ROOT file: 181026_0946_Bkg.root |
395
|
Fri Oct 26 03:24:25 2018 |
ATS & JLT | Background |
Background BRIKEN control measurement
No DLT
2018/10/26
Start: 10:00 aprox
Stop: 11:20
ROOT file: 181026_1120_Bkg.root |
397
|
Fri Oct 26 03:57:37 2018 |
ATS & JLT | Background |
Background BRIKEN control measurement
No DLT
2018/10/26
Start: 11:57
Stop: 14:00
ROOT file: 181026_1400_Bkg.root
Measurement re-started at 15:58 |
399
|
Sun Oct 28 07:41:03 2018 |
AT, JA, AA | Background |
Dacq was reinitialized
Background was measurement
Pulser: YES
DLT: No
Online: 181029_1640prevday_1723_Bkg_Pulser.root
Start:16:40
Stop: 17:23
Comment: We started a Ge filling manually, to check if the funny behavior of the
Corr_BR_BR can be reproduced. It remained clean. So we do not yet what caused the
funny behavior.
Funny behavior definition: periodic peaks appeared in the Corr_BR_BR file
The synch software problem will be solved tomorrow.
Tomorrow definition: a mystical land were 99% of all human productivity, motivation
and achievement is stored |
400
|
Mon Oct 29 12:08:12 2018 |
JR, JA, AT | Background |
Background was measurement
Pulser: NO
DLT: No
Online:
Start:21:07
Stop:
Comment: V2A8C9 contains now the 10Hz clock signal coming from
the same section of the clock where the 100Hz sync signal is extracted.
It will be there even if we inhibit the pulser signals to the preamps
SYNC pulser is 200Hz because
the gate generator produces double peaks from the 100Hz clock
v1a6c13-16 had a configuration error (Trigger window to short)
It's corrected at 14:55 (2018/10/30) on file 181030_Conf_BrikenFull_LowThrAdj_masterCLK.xlsx . |
199
|
Sat Mar 25 13:33:12 2017 |
JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura, R. Caballero | BRIKEN+AIDA relocated |
We moved AIDA+BRIKEN by 107cm upstream.
See attached photos.
BRIKEN was aligned with the laser and
AIDA aligned to BRIKEN. |
Attachment 1: NewLocation1.jpg
|
|
Attachment 2: NewLocation2.jpg
|
|
106
|
Thu Nov 3 15:09:52 2016 |
A. Tarifeno-Saldivia, C. Domingo-Pardo, J.L. Tain | BRIKEN neutron efficiency |
Geant4 BRIKEN Neutron efficiency calculations as a function of neutron energy and for some spectra: Ga84-vandle, Br88-endf71, Rb94-endf71, Rb95-endf71, I137-endf71, Cf252-MCNPX
Calculations for the current BRIKEN detector configuration:
Hybrid mode, 140 counters, assembled in July16.
Summary of files:
BRIKEN_hybrid140.svg ---> Scheme for the current tube configuration.
BRIKEN_hybrid140_efficiency.xlsx ---> Sheet with results of the calculations.
Efficiency_vs_Energy_HybridConf_140b.svg ---> Plot of the neutron efficiency by Ring (see BRIKEN_hybrid140.svg) and total. |
Attachment 1: BRIKEN_hybrid140.svg
|
|
Attachment 2: Efficiency_vs_Energy_HybridConf_140b.svg
|
|
Attachment 3: BRIKEN_hybrid140_efficiency.xlsx
|