AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 20 of 21  ELOG logo
Entry  Fri Nov 25 03:37:23 2016, AT, Background Beam OFF/ON 161124_2106_013_BRIKEN.svg161124_2106_013_Rings.svg161124_2106_013_RateBRIKEN.svg
16/11/24 21h06min: Background measurement Beam OFF + Beam ON tunning and 22C

21:41 : Until now Beam OFF, BigRips team tunning the machine. An online is saved 
Entry  Fri Nov 25 03:41:40 2016, AT, Run setups RUNsum_kanagoda.pdf
Run setups during preparation of Fallon Parasitic experiments (Kanungo experiment beam time) can be found on 
http://ribfdaq/~gamma16/expdbrunsum.php
Entry  Fri Nov 25 03:49:44 2016, AT, Background Beam ON 
16/11/25 12h28min: Background measurement beam ON 19B
Entry  Fri Nov 25 21:47:05 2016, AT, Background Beam OFF 161125_1617_017_BRIKEN.svg161125_1617_017_RateBRIKEN.svg
16:17  Background beam OFF

16:27 Beam On. Acquisition stopped just after beam ON. File:
Entry  Fri Nov 25 21:48:49 2016, AT, DACQ 
19:00  Test calibration 
Entry  Fri Nov 25 21:49:36 2016, AT, Background Beam OFF 
21:27  Beam off. Background is started.

22:10  Acquisition is stopped. Files:
Entry  Fri Nov 25 21:50:42 2016, AT, New Conf File 
161125Conf_BrikenFull.xlsx
Entry  Sat Nov 26 00:04:15 2016, AT, Elog 
RIKEN Elog during Fallon Parasitic experiments

Fallon Group: 
Entry  Sat Nov 26 00:15:12 2016, AT, 41Al run0 161126_0815_000_RateBRIKEN.svg
08:15    BigRips tunning for centering 41Al. Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers
Entry  Sat Nov 26 06:30:30 2016, AT, Setup 
Setup for parasitic experiments

Energy 41Al @ F11 is around 145MeV/u
Entry  Sat Nov 26 06:37:37 2016, AT, 41Al run 1 
11:07  New acquisition is started for tungsten degraders 
1mm W + 1mm Al
0.5mm W + 1mm Al 
Entry  Fri Nov 24 00:45:36 2017, AT, ur17b BRIKEN files 
List of files in BRIKEN DAQ PC:

Experiment DA1702 (including the test with YSO during first night)
Entry  Thu Nov 22 07:01:36 2018, AT, PID high mass seting (165Pm) - RIBF148 F7pid_RIBF148_165PmSetting_labels.png
PID plot for the high mass setting (165Pm), run 2018, rare earth peak experiment.
Partial statistics (~30h) from identification at F7.
Please use for internal reports about the BRIKEN activities.
Entry  Fri May 26 14:27:08 2017, AIM, AT, BRIKEN Configuration File 170526_Conf_BrikenFull.xlsx
New configuration file of BRIKEN
Changes of 26th-May-2017
Previous config file 24th-May-2017
Entry  Sat May 27 11:19:57 2017, AIM, AT, AIDA+BRIKEN background 
Background measurement AIDA+BRIKEN
AIDA is inside BRIKEN
Entry  Sat May 27 04:46:55 2017, AIM, sources info 
Here is the sunflower webpage with information on the calibration sources:

http://www.nishina.riken.jp/collaboration/SUNFLOWER/misc/util/ribfsource.html
Entry  Sat May 2 19:32:08 2015, AE, transfer data AIDA->BRIKEN 
A test program for online data transfer is available in aidas1 PC at:

/homes/npg/aev/AIDAbriken/AIDA-jorge-san.exe
Entry  Mon Nov 28 16:18:07 2016, AE, DAQ synchronization  
Please see: https://elog.ph.ed.ac.uk/AIDA/493
Entry  Wed Jul 20 16:07:58 2016, A.Tarifeņo, J.L. Tain, J. Agramunt, A. Tolosa, ..., 252Cf 
19/Jul/2016
Scanning of the efficiency as a function of longitudinal position
Entry  Thu May 25 10:15:02 2017, A.T, G. K, A.M, A. A, CLOVER, 133Ba no pulser 

Source in position z=0 with the carton (cardboard) high-end, high-tech holder, but no AIDA (of course).
No pulser. Remember that the pulser is providing peaks around 
ELOG V3.1.3-7933898