AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 20 of 21  ELOG logo
ID Date Authordown Subject
  161   Fri Nov 25 03:37:23 2016 ATBackground Beam OFF/ON
16/11/24 21h06min: Background measurement Beam OFF + Beam ON tunning and 22C

21:41 : Until now Beam OFF, BigRips team tunning the machine. An online is saved 
File:        161124_2106_013.root 
Attachment 1: 161124_2106_013_BRIKEN.svg
161124_2106_013_BRIKEN.svg
Attachment 2: 161124_2106_013_Rings.svg
161124_2106_013_Rings.svg
Attachment 3: 161124_2106_013_RateBRIKEN.svg
161124_2106_013_RateBRIKEN.svg
  162   Fri Nov 25 03:41:40 2016 ATRun setups
Run setups during preparation of Fallon Parasitic experiments (Kanungo experiment beam time) can be found on 
http://ribfdaq/~gamma16/expdbrunsum.php

A copy of the information in this page is placed here!

According to their Setup, they are using C targets on F8 and F11. The targets can be IN/OUT.
Attachment 1: RUNsum_kanagoda.pdf
RUNsum_kanagoda.pdf RUNsum_kanagoda.pdf RUNsum_kanagoda.pdf RUNsum_kanagoda.pdf RUNsum_kanagoda.pdf RUNsum_kanagoda.pdf
  163   Fri Nov 25 03:49:44 2016 ATBackground Beam ON
16/11/25 12h28min: Background measurement beam ON 19B
  164   Fri Nov 25 21:47:05 2016 ATBackground Beam OFF
16:17  Background beam OFF

16:27 Beam On. Acquisition stopped just after beam ON. File:
161125_1617_017.dlt
161125_1617_017.root

BRIKEN rate beam OFF (background): 0.34 +- 0.03 n/s
Attachment 1: 161125_1617_017_BRIKEN.svg
161125_1617_017_BRIKEN.svg
Attachment 2: 161125_1617_017_RateBRIKEN.svg
161125_1617_017_RateBRIKEN.svg
  165   Fri Nov 25 21:48:49 2016 ATDACQ
19:00  Test calibration 
  166   Fri Nov 25 21:49:36 2016 ATBackground Beam OFF
21:27  Beam off. Background is started.

22:10  Acquisition is stopped. Files:
  167   Fri Nov 25 21:50:42 2016 ATNew Conf File
161125Conf_BrikenFull.xlsx
  169   Sat Nov 26 00:04:15 2016 ATElog
RIKEN Elog during Fallon Parasitic experiments

Fallon Group: 
Elog is found in http://ribf-exp.riken.jp/elog/DALI2+Fall+2016/

BRIKEN collaboration: 
We keep elog from Takeshi experiments (Nishimura-san desicion!). This elog is found in 

http://ribf-exp.riken.jp/elog/RIBF123/
  170   Sat Nov 26 00:15:12 2016 AT41Al run0
08:15    BigRips tunning for centering 41Al. Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers

08:45    
Beam Off for intervention

08:50    
Degrader is modified to 3mm Pb

09:44    
Acquisition is stopped Files:
161126_0815_000.dlt
161126_0815_000.root

Rates:
BRIKEN	:  85.2 Hz
F11R	: 33.5 Hz

Daq Conf. File	: 161125Conf_BrikenFull.xlsx
Attachment 1: 161126_0815_000_RateBRIKEN.svg
161126_0815_000_RateBRIKEN.svg
  171   Sat Nov 26 06:30:30 2016 ATSetup
Setup for parasitic experiments

Energy 41Al @ F11 is around 145MeV/u

Degraders:
- Pb 3mm width  ---> IN beam
- Tungsten:
 1) 0.5 mm W + 1mm Al  ---> IN/OUT beam
 2) 0.3 mm W + 1mm Al  ---> IN/OUT beam
 3) 1.0 mm W + 1mm Al  ---> IN/OUT beam
  172   Sat Nov 26 06:37:37 2016 AT41Al run 1
11:07  New acquisition is started for tungsten degraders 
1mm W + 1mm Al
0.5mm W + 1mm Al 
3mm Pb (fixed on the beam)

11:14  Online is saved and then cleared
file:   161126_1107_001_1114.root

Rates:
F11R	:   10.5Hz
BRIKEN	:  170 Hz

11:18 Tungsten degraders are removed.

11:20 Beam Off

11:30 Beam ON

OBS:  Something happens in between with the beam intensity!!!  
Rates:
F11R	:   10.5Hz   &&  4.54 Hz
BRIKEN	:  177.7 Hz  && 160 Hz

11:41 Beam OFF

11:55 Acquisition is stopped. Files
 161126_1107_001.dlt  (full run)
 161126_1107_001.root  (Online from 11:18)
  356   Fri Nov 24 00:45:36 2017 ATur17b BRIKEN files
List of files in BRIKEN DAQ PC:

Experiment DA1702 (including the test with YSO during first night)
*.dlt: 350
*.xlsx: 10
*.root: 162

Experiment RIBF139
*.dlt: 162
*.xlsx: 7
*.root: 101
  419   Thu Nov 22 07:01:36 2018 ATPID high mass seting (165Pm) - RIBF148
PID plot for the high mass setting (165Pm), run 2018, rare earth peak experiment.
Partial statistics (~30h) from identification at F7.
Please use for internal reports about the BRIKEN activities.
Attachment 1: F7pid_RIBF148_165PmSetting_labels.png
F7pid_RIBF148_165PmSetting_labels.png
  310   Fri May 26 14:27:08 2017 AIM, ATBRIKEN Configuration File
New configuration file of BRIKEN
Changes of 26th-May-2017
Previous config file 24th-May-2017

After the 152Eu calibration, the threshold of 
>> V2A7C4 was increased from 20 to 30. 
>> V2A7C6 was increased from 30 to 40. 

AIDA veto plastic (40cm after the stack of DSSD) and 
the silicon detector (shielding hole) were calibrated 
with the Compton edge of 137Cs (891keV).
Attachment 1: 170526_Conf_BrikenFull.xlsx
  315   Sat May 27 11:19:57 2017 AIM, ATAIDA+BRIKEN background
Background measurement AIDA+BRIKEN
AIDA is inside BRIKEN

AIDA was taking data.
Start: run  31 subrun 41
Stop:  run 41 subrun 239


BRIKEN started later.

Start: 27th-May, 19:19
Stop: 28th-May, around 11:00

DLT File name:170527_1919_bck_AIDAinside_022.dlt
RUN numbers: 022-024
RootFile: 170527_1919_1914_bck_AIDAin.root


Comments: at 28th-May, 19:17, reset time stamp
  312   Sat May 27 04:46:55 2017 AIMsources info
Here is the sunflower webpage with information on the calibration sources:

http://www.nishina.riken.jp/collaboration/SUNFLOWER/misc/util/ribfsource.html
  11   Sat May 2 19:32:08 2015 AEtransfer data AIDA->BRIKEN
A test program for online data transfer is available in aidas1 PC at:

/homes/npg/aev/AIDAbriken/AIDA-jorge-san.exe

no arguments are required to run it from command line
  189   Mon Nov 28 16:18:07 2016 AEDAQ synchronization

Please see: https://elog.ph.ed.ac.uk/AIDA/493

  51   Wed Jul 20 16:07:58 2016 A.Tarifeņo, J.L. Tain, J. Agramunt, A. Tolosa, ...252Cf
19/Jul/2016
Scanning of the efficiency as a function of longitudinal position

File:160719_BRIKEN_252Cf_XXmm_*.dlt
Online:160719_BRIKEN_252Cf_XXmm.root
Run: 011-025
Distances: -275,-175,-125,-75,-50.-25,+25,+50,+75,+125,+175,+225,+275,+375mm
  296   Thu May 25 10:15:02 2017 A.T, G. K, A.M, A. ACLOVER, 133Ba no pulser
Source in position z=0 with the carton (cardboard) high-end, high-tech holder, but no AIDA (of course).
No pulser. Remember that the pulser is providing peaks around 

Start: 18:11
Stop: 18:31

Files
170525_1811_133Ba_z0cm_003.dlt
170525_1831_133Ba_z0cm_noD4Pulser.root
ELOG V3.1.4-unknown