ID |
Date |
Author |
Subject |
161
|
Fri Nov 25 03:37:23 2016 |
AT | Background Beam OFF/ON |
16/11/24 21h06min: Background measurement Beam OFF + Beam ON tunning and 22C
21:41 : Until now Beam OFF, BigRips team tunning the machine. An online is saved
File: 161124_2106_013.root |
Attachment 1: 161124_2106_013_BRIKEN.svg
|
|
Attachment 2: 161124_2106_013_Rings.svg
|
|
Attachment 3: 161124_2106_013_RateBRIKEN.svg
|
|
162
|
Fri Nov 25 03:41:40 2016 |
AT | Run setups |
Run setups during preparation of Fallon Parasitic experiments (Kanungo experiment beam time) can be found on
http://ribfdaq/~gamma16/expdbrunsum.php
A copy of the information in this page is placed here!
According to their Setup, they are using C targets on F8 and F11. The targets can be IN/OUT. |
Attachment 1: RUNsum_kanagoda.pdf
|
|
163
|
Fri Nov 25 03:49:44 2016 |
AT | Background Beam ON |
16/11/25 12h28min: Background measurement beam ON 19B |
164
|
Fri Nov 25 21:47:05 2016 |
AT | Background Beam OFF |
16:17 Background beam OFF
16:27 Beam On. Acquisition stopped just after beam ON. File:
161125_1617_017.dlt
161125_1617_017.root
BRIKEN rate beam OFF (background): 0.34 +- 0.03 n/s |
Attachment 1: 161125_1617_017_BRIKEN.svg
|
|
Attachment 2: 161125_1617_017_RateBRIKEN.svg
|
|
165
|
Fri Nov 25 21:48:49 2016 |
AT | DACQ |
19:00 Test calibration |
166
|
Fri Nov 25 21:49:36 2016 |
AT | Background Beam OFF |
21:27 Beam off. Background is started.
22:10 Acquisition is stopped. Files: |
167
|
Fri Nov 25 21:50:42 2016 |
AT | New Conf File |
161125Conf_BrikenFull.xlsx |
169
|
Sat Nov 26 00:04:15 2016 |
AT | Elog |
RIKEN Elog during Fallon Parasitic experiments
Fallon Group:
Elog is found in http://ribf-exp.riken.jp/elog/DALI2+Fall+2016/
BRIKEN collaboration:
We keep elog from Takeshi experiments (Nishimura-san desicion!). This elog is found in
http://ribf-exp.riken.jp/elog/RIBF123/ |
170
|
Sat Nov 26 00:15:12 2016 |
AT | 41Al run0 |
08:15 BigRips tunning for centering 41Al. Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers
08:45
Beam Off for intervention
08:50
Degrader is modified to 3mm Pb
09:44
Acquisition is stopped Files:
161126_0815_000.dlt
161126_0815_000.root
Rates:
BRIKEN : 85.2 Hz
F11R : 33.5 Hz
Daq Conf. File : 161125Conf_BrikenFull.xlsx |
Attachment 1: 161126_0815_000_RateBRIKEN.svg
|
|
171
|
Sat Nov 26 06:30:30 2016 |
AT | Setup |
Setup for parasitic experiments
Energy 41Al @ F11 is around 145MeV/u
Degraders:
- Pb 3mm width ---> IN beam
- Tungsten:
1) 0.5 mm W + 1mm Al ---> IN/OUT beam
2) 0.3 mm W + 1mm Al ---> IN/OUT beam
3) 1.0 mm W + 1mm Al ---> IN/OUT beam |
172
|
Sat Nov 26 06:37:37 2016 |
AT | 41Al run 1 |
11:07 New acquisition is started for tungsten degraders
1mm W + 1mm Al
0.5mm W + 1mm Al
3mm Pb (fixed on the beam)
11:14 Online is saved and then cleared
file: 161126_1107_001_1114.root
Rates:
F11R : 10.5Hz
BRIKEN : 170 Hz
11:18 Tungsten degraders are removed.
11:20 Beam Off
11:30 Beam ON
OBS: Something happens in between with the beam intensity!!!
Rates:
F11R : 10.5Hz && 4.54 Hz
BRIKEN : 177.7 Hz && 160 Hz
11:41 Beam OFF
11:55 Acquisition is stopped. Files
161126_1107_001.dlt (full run)
161126_1107_001.root (Online from 11:18) |
356
|
Fri Nov 24 00:45:36 2017 |
AT | ur17b BRIKEN files |
List of files in BRIKEN DAQ PC:
Experiment DA1702 (including the test with YSO during first night)
*.dlt: 350
*.xlsx: 10
*.root: 162
Experiment RIBF139
*.dlt: 162
*.xlsx: 7
*.root: 101 |
419
|
Thu Nov 22 07:01:36 2018 |
AT | PID high mass seting (165Pm) - RIBF148 |
PID plot for the high mass setting (165Pm), run 2018, rare earth peak experiment.
Partial statistics (~30h) from identification at F7.
Please use for internal reports about the BRIKEN activities. |
Attachment 1: F7pid_RIBF148_165PmSetting_labels.png
|
|
310
|
Fri May 26 14:27:08 2017 |
AIM, AT | BRIKEN Configuration File |
New configuration file of BRIKEN
Changes of 26th-May-2017
Previous config file 24th-May-2017
After the 152Eu calibration, the threshold of
>> V2A7C4 was increased from 20 to 30.
>> V2A7C6 was increased from 30 to 40.
AIDA veto plastic (40cm after the stack of DSSD) and
the silicon detector (shielding hole) were calibrated
with the Compton edge of 137Cs (891keV). |
Attachment 1: 170526_Conf_BrikenFull.xlsx
|
315
|
Sat May 27 11:19:57 2017 |
AIM, AT | AIDA+BRIKEN background |
Background measurement AIDA+BRIKEN
AIDA is inside BRIKEN
AIDA was taking data.
Start: run 31 subrun 41
Stop: run 41 subrun 239
BRIKEN started later.
Start: 27th-May, 19:19
Stop: 28th-May, around 11:00
DLT File name:170527_1919_bck_AIDAinside_022.dlt
RUN numbers: 022-024
RootFile: 170527_1919_1914_bck_AIDAin.root
Comments: at 28th-May, 19:17, reset time stamp |
312
|
Sat May 27 04:46:55 2017 |
AIM | sources info |
Here is the sunflower webpage with information on the calibration sources:
http://www.nishina.riken.jp/collaboration/SUNFLOWER/misc/util/ribfsource.html |
11
|
Sat May 2 19:32:08 2015 |
AE | transfer data AIDA->BRIKEN |
A test program for online data transfer is available in aidas1 PC at:
/homes/npg/aev/AIDAbriken/AIDA-jorge-san.exe
no arguments are required to run it from command line |
189
|
Mon Nov 28 16:18:07 2016 |
AE | DAQ synchronization |
Please see: https://elog.ph.ed.ac.uk/AIDA/493 |
51
|
Wed Jul 20 16:07:58 2016 |
A.Tarifeņo, J.L. Tain, J. Agramunt, A. Tolosa, ... | 252Cf |
19/Jul/2016
Scanning of the efficiency as a function of longitudinal position
File:160719_BRIKEN_252Cf_XXmm_*.dlt
Online:160719_BRIKEN_252Cf_XXmm.root
Run: 011-025
Distances: -275,-175,-125,-75,-50.-25,+25,+50,+75,+125,+175,+225,+275,+375mm |
296
|
Thu May 25 10:15:02 2017 |
A.T, G. K, A.M, A. A | CLOVER, 133Ba no pulser |
Source in position z=0 with the carton (cardboard) high-end, high-tech holder, but no AIDA (of course).
No pulser. Remember that the pulser is providing peaks around
Start: 18:11
Stop: 18:31
Files
170525_1811_133Ba_z0cm_003.dlt
170525_1831_133Ba_z0cm_noD4Pulser.root |