AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
MONNET
BRIKEN, Page 20 of 21
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
412 Entries
Goto page
Previous
1
,
2
,
3
...
19
, 20,
21
Next
All
ID
Date
Author
Subject
Text
160
Fri Nov 25 03:15:46 2016
AT
Background Beam ON
16/11/24 19h38min:
Background measurement during tunning of
BigRips from 27-29F to 22C is started.
161
Fri Nov 25 03:37:23 2016
AT
Background Beam OFF/ON
16/11/24 21h06min: Background measurement
Beam OFF + Beam ON tunning and 22C
162
Fri Nov 25 03:41:40 2016
AT
Run setups
Run setups during preparation of Fallon Parasitic
experiments (Kanungo experiment beam time)
can be found on
163
Fri Nov 25 03:49:44 2016
AT
Background Beam ON
16/11/25 12h28min: Background measurement
beam ON 19B
164
Fri Nov 25 21:47:05 2016
AT
Background Beam OFF
16:17 Background beam OFF
16:27 Beam On. Acquisition stopped just after
165
Fri Nov 25 21:48:49 2016
AT
DACQ
19:00 Test calibration
166
Fri Nov 25 21:49:36 2016
AT
Background Beam OFF
21:27 Beam off. Background is started.
22:10 Acquisition is stopped. Files:
167
Fri Nov 25 21:50:42 2016
AT
New Conf File
161125Conf_BrikenFull.xlsx
169
Sat Nov 26 00:04:15 2016
AT
Elog
RIKEN Elog during Fallon Parasitic experiments
Fallon Group:
170
Sat Nov 26 00:15:12 2016
AT
41Al run0
08:15 BigRips tunning for centering 41Al.
Adqusition started.
Degrader: 5mm Pb located between MUSIC chambers
171
Sat Nov 26 06:30:30 2016
AT
Setup
Setup for parasitic experiments
Energy 41Al @ F11 is around 145MeV/u
172
Sat Nov 26 06:37:37 2016
AT
41Al run 1
11:07 New acquisition is started for tungsten
degraders
1mm W + 1mm Al
356
Fri Nov 24 00:45:36 2017
AT
ur17b BRIKEN files
List of files in BRIKEN DAQ PC:
Experiment DA1702 (including the test with
419
Thu Nov 22 07:01:36 2018
AT
PID high mass seting (165Pm) - RIBF148
PID plot for the high mass setting (165Pm),
run 2018, rare earth peak experiment.
Partial statistics (~30h) from identification
310
Fri May 26 14:27:08 2017
AIM, AT
BRIKEN Configuration File
New configuration file of BRIKEN
Changes of 26th-May-2017
Previous config file 24th-May-2017
315
Sat May 27 11:19:57 2017
AIM, AT
AIDA+BRIKEN background
Background measurement AIDA+BRIKEN
AIDA is inside BRIKEN
312
Sat May 27 04:46:55 2017
AIM
sources info
Here is the sunflower webpage with information
on the calibration sources:
11
Sat May 2 19:32:08 2015
AE
transfer data AIDA->BRIKEN
A test program for online data transfer is
available in aidas1 PC at:
189
Mon Nov 28 16:18:07 2016
AE
DAQ synchronization
Please see: https://elog.ph.ed.ac.uk/AIDA/493
51
Wed Jul 20 16:07:58 2016
A.Tarifeņo, J.L. Tain, J. Agramunt, A. Tolosa, ...
252Cf
19/Jul/2016
Scanning of the efficiency as a function
of longitudinal position
Goto page
Previous
1
,
2
,
3
...
19
, 20,
21
Next
All
ELOG V3.1.3-7933898