Thu Nov 3 05:27:48 2016, Alvaro, Tain, Gabor, Ale, 152Eu
|
Energy calibration for clovers, 152Eu
|
Tue Mar 28 09:10:09 2017, Many, 152Eu 
|
152Eu source inside BRIKEN for CLOVER calibration.
Also calibration of Si-dE with 60Co source
and AIDA_PL calibration with 60Co source.
|
Fri May 26 02:17:40 2017, AT, AIM, JLT,AA, PV, KM, 152Eu
|
Calibration with 152Eu source.
START time:10:15
|
Mon Oct 23 09:43:00 2017, RG, RY, MS, SG, AT, 137Cs YSO   
|
measurement of 137Cs with YSO
after matching the gains of the
HighGain channels
|
Fri Nov 2 14:18:54 2018, JLT, 136Sn at ZDS
|
Measurement of neutron background while
Jungclaus experiment is running
Secondary beam 136Sn at ~140MeV/u, Be target, 136Sn in the ZDS
|
Fri Nov 2 01:07:21 2018, JLT, 134Sn/133In on ZDS  
|
Measurement of neutron background while
Jungclaus experiment is running
Secondary beam:
|
Wed Oct 31 03:41:33 2018, JLT, 134Sn at ZDS
|
Measurement of neutron background while
Jungclaus experiment is running
Secondary beam 134Sn at ~140MeV/u, Au target, 134Sn in the ZDS
|
Wed Oct 31 00:36:34 2018, JLT, 133In at ZDS
|
Measurement of neutron background while
Jungclaus experiment is running
Secondary beam 134Sn at XXMeV, Be target, 133In i the ZDS
|
Tue Jun 13 07:35:35 2017, briken team, 133Ba calibration
|
After experiment 133Ba calibration
Working directory: /data/1706FinalCalibrations
Configuration file: 170604_Conf_BrikenFull_AfterCrisis.xlsx |
Tue Jun 13 08:02:35 2017, briken team, 133Ba calibration
|
After experiment 133Ba calibration
Working directory: /data/1706FinalCalibrations
Configuration file: 170604_Conf_BrikenFull_AfterCrisis.xlsx |
Fri Nov 25 03:15:46 2016, AT, Background Beam ON
|
16/11/24 19h38min:
Background measurement during tunning of BigRips from 27-29F to 22C is started.
|