AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 6 of 21  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Mon May 29 05:40:49 2017, K. Matsui, energy loss at logn  
 
Entry  Mon May 29 04:17:34 2017, YS, Clover Efficiency eff_crystal.pdfeff_total.pdfEURICA_efficiency.jpg
Clover gamma detection efficiency calculation with 152Eu
Date of the measurement: 2017-05-26 10:15
root file: 170526_1015_152Eu_noAIDA_z0cm_014.root
Entry  Sun May 28 11:41:24 2017, YS, CLOVER energy calibration 
Clover calibration with 152Eu

Used peaks [keV]: 121.7817, 244.6975, 344.2785, 444.000, 778.9045, 867.378, 964.100, 1112.074, 1408.011
Entry  Sat May 27 11:19:57 2017, AIM, AT, AIDA+BRIKEN background 
Background measurement AIDA+BRIKEN
AIDA is inside BRIKEN
Entry  Sat May 27 10:36:20 2017, JA,AT,JLT, BRIKEN DACQ Gasific70Manual.pdfGasificShort.pdf
Manuals for BRIKEN DACQ: 
GasificShort.pdf including "Run protocol"
and Gasific70Manual.pdf (long)
Entry  Sat May 27 04:46:55 2017, AIM, sources info 
Here is the sunflower webpage with information on the calibration sources:

http://www.nishina.riken.jp/collaboration/SUNFLOWER/misc/util/ribfsource.html
Entry  Fri May 26 14:42:12 2017, JL, AT, Background 
Background measurement (no AIDA)

Entry  Fri May 26 14:27:08 2017, AIM, AT, BRIKEN Configuration File 170526_Conf_BrikenFull.xlsx
New configuration file of BRIKEN
Changes of 26th-May-2017
Previous config file 24th-May-2017
Entry  Fri May 26 09:07:46 2017, J. Agramunt, Synchronization Monitoring synchroCheck.pngSynchronizationMonitoring.pdf
We started the synchronization monitoring programs to check that
it is OK as can be seen in the figure below
Entry  Fri May 26 04:20:54 2017, JLT,AA,AT, CLOVER 60Co 
60Co No AIDA, Efficiency calibration

Start: 12:21
Entry  Fri May 26 03:52:23 2017, AT,AA,JLT, CLOVER, 137Cs 
137Cs, No AIDA, Efficiency calibration

Source ID: 393
Entry  Fri May 26 03:24:38 2017, GK,VP, AT, AA, CLOVER, 133Ba 
133Ba source efficiency calibration, no AIDA

Start: 11:23
Entry  Fri May 26 02:17:40 2017, AT, AIM, JLT,AA, PV, KM, 152Eu 
Calibration with 152Eu source.

START time:10:15
Entry  Thu May 25 14:31:46 2017, AT, JLT, AA, AIM, Background measurement 7x
Background, No AIDA

Start:22:31
Entry  Thu May 25 13:56:00 2017, AT, JLT, AA, 252Cf 
252Cf source in Z=0cm position. 

Start:21:57
Entry  Thu May 25 13:42:45 2017, AT, PC,KR,JLT,AA, 252Cf 
252Cf source in Z=0cm position. 

Start:21:41
Entry  Thu May 25 13:38:11 2017, AT, PC, KR, JLT, AA, Clover, detectors in new position CLOVER-sketch.jpgD4-insertion.jpgG7-insertion.jpg
Both clover detectors were moved. They are in a symmetrical position. The end on the clover nose is of the order
of 3-4 mm from the AIDA tunnel.
Entry  Thu May 25 13:24:02 2017, AT,PC,KR,JLT,AA, CLOVER, detector not in its rigth position 
We have noticed that D4 is not in its right position. That explains the different number of counts in the
detectors. 
Probably of the order of 3 cm away from its nominal place.
Entry  Thu May 25 12:53:47 2017, AT, PC, JLT, KR, AA, Clover, 60Co 
60Co source 

Source ID: CD395
Entry  Thu May 25 12:49:55 2017, AT, JLT,PC,AA, Clover, 133Ba, LN2 filling 
We started the measurement of the source when the N2 filling started. Just to  check if there are funny things
related to the filling.
ELOG V3.1.4-unknown