AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 174     Entry time: Sat Jan 15 15:38:25 2022
Author: JM, OH, TD 
Subject: FEE installation, cable management 

All 8 FEEs have been installed in their holders.

The damaged feedthrough does not have the D-connector on the adaptor board inserted into the falnge but the FEE is connected to the adaptor board. 

FEE's were carefully installed, with one person inserting FEE and another making sure FEE was straight and on the correct pin positions. The spring lock on the bottom FEE's have been tightend and zip ties have been placed to make sure they are secured. 

Rack has been populated with cables from the rack to chamber laid out. Cables mostly go above the rack and hang off the large frame. This frame or the CARME frame takes most of the weight of the cables before they are plugged into the FEEs.   

Cables are numbered 1-8. Brown ethernet cables are numbered 1-4, green 5,6 and yellow 7,8. Numbers correspnd to Bottom FEE (1,2), Side bottom FEE (3,4), Side top FEE (5,6), Top FEE (7,8)

 

Attachment 1: 20220114_104819.jpg  928 kB  | Hide | Hide all
20220114_104819.jpg
Attachment 2: 20220114_105152.jpg  1.088 MB  | Hide | Hide all
20220114_105152.jpg
Attachment 3: 20220114_105213.jpg  984 kB  | Hide | Hide all
20220114_105213.jpg
Attachment 4: 20220115_133808.jpg  2.099 MB  | Hide | Hide all
20220115_133808.jpg
Attachment 5: 20220115_133820.jpg  2.570 MB  | Hide | Hide all
20220115_133820.jpg
ELOG V3.1.4-unknown