04:24
Temperature setpoint 110 K
Rates appeared stable throughout the hour ~10^2 peak height. Last 5 minutes rutherford peak height appears reduced, cycling from 10^1 to 10^2. If this continues with sustained low density, temperature will be cycled to 125 K and back down.
Merger OK
Data rate = 1300 kb/sec
Ring avg pressure = 3.1E-10 mbar
Temperatures OK
System checks OK - wr fail attached
Leakage current ~ 3.228 uA
04:33
Rutherford rate appears to have increased and stabilised again around 10^2 peak height. |