AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 370     Entry time: Tue Aug 9 13:44:16 2022
Author: TD, JM 
Subject: Tuesday 9 August 
14.00 CARME vacuum c. 1.8e-10 mbar - see attachment 1

open water inlet/outlet taps

NIM bin (MACBs, Ortec 480 Pulser, CAEN N1419ET) switched ON

USB-controlled ac mains relay switched ON - water & interlock LEDs active

Require VETAR2 (previous returned to Nik Kurz) and network switch (currently with AIDA@DESPEC)

Turbo pump ON - normal operation

Ion pumps ON - normal operation

16.30 ML informs us that ambient temperature of CRYRING cave has been increased from c. 16 deg C to c. 21 deg C and that this is likely the cause of the change in vacuum 
pressure in YR09 and the rest of the storage ring.

obtained VETAR2 and crate 

anydesk restarted
Attachment 1: Capture_1.PNG  262 kB  Uploaded Tue Aug 9 14:48:30 2022  | Hide | Hide all
Capture_1.PNG
Attachment 2: 20220809_163450.jpg  1.838 MB  Uploaded Tue Aug 9 17:03:00 2022  | Hide | Hide all
20220809_163450.jpg
Attachment 3: 20220809_135840.jpg  549 kB  Uploaded Tue Aug 9 17:03:21 2022  | Hide | Hide all
20220809_135840.jpg
Attachment 4: 20220809_135833.jpg  498 kB  Uploaded Tue Aug 9 17:03:37 2022  | Hide | Hide all
20220809_135833.jpg
Attachment 5: 20220809_135801.jpg  1.924 MB  Uploaded Tue Aug 9 17:03:55 2022  | Hide | Hide all
20220809_135801.jpg
ELOG V3.1.4-unknown