AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 378     Entry time: Sun Aug 14 06:50:58 2022
Author: TD, JM 
Subject: Sunday 14 August 
07.51 DAQ continues files 22Feb/R97

      ASIC settings 2022Jan31-11-52-00
       slow comparator 0x64

      EG&G Ortec 448 Pulser OFF

      All system wide checks OK

Attachment 1 - ADC data item stats

Attachment 2 - FEE64 temps OK

Attachments 3 & 4, 8 & 9 - per FEE64 1.8.W spectra 20us FSR and 200us FSR

Attachments 5 & 6 - per FEE64 1.8.L spectra

Attachment 7 - per FEE64 stat spectra

Leakage current remains 8.36 uA, 100V. 

Bias power OFF, SIP ion pump power back ON. NIM crate powered off. Motors pi and nnrpi1 still on for remote access. 
Compressed air off, water off. Fee relay power off and power cable disconnected. Motors box off. Safety pin for motors reinserted. 

Checked cable harnesses at cryring. 2 good short sections found and left with boxes in cryring. 2 damaged long sections (bad pin and broken ceramic) taken to repair in 
Edinburgh.
Attachment 1: 60.PNG  193 kB  Uploaded Sun Aug 14 07:58:06 2022  | Hide | Hide all
60.PNG
Attachment 2: 59.PNG  210 kB  Uploaded Sun Aug 14 07:58:06 2022  | Hide | Hide all
59.PNG
Attachment 3: 58.PNG  308 kB  Uploaded Sun Aug 14 07:58:06 2022  | Hide | Hide all
58.PNG
Attachment 4: 57.PNG  370 kB  Uploaded Sun Aug 14 07:58:06 2022  | Hide | Hide all
57.PNG
Attachment 5: 56.PNG  248 kB  Uploaded Sun Aug 14 07:58:06 2022  | Hide | Hide all
56.PNG
Attachment 6: 55.PNG  244 kB  Uploaded Sun Aug 14 07:58:06 2022  | Hide | Hide all
55.PNG
Attachment 7: 54.PNG  295 kB  Uploaded Sun Aug 14 07:58:06 2022  | Hide | Hide all
54.PNG
Attachment 8: 61.PNG  316 kB  Uploaded Sun Aug 14 08:02:17 2022  | Hide | Hide all
61.PNG
Attachment 9: 62.png  379 kB  Uploaded Sun Aug 14 08:02:37 2022  | Hide | Hide all
62.png
Attachment 10: 20220814_091209.jpg  1.208 MB  Uploaded Sun Aug 14 14:25:19 2022  | Hide | Hide all
20220814_091209.jpg
ELOG V3.1.4-unknown