Message ID: 395     Entry time: Tue May 2 15:02:09 2023
Author: CB, JM 
Subject: All detectors and harnesses mounted  

Completed mounting harnesses and detectors.

The strain relief support for the bottom most two detectors on the feedthrough side was not mounted because we could not find enough MACOR parts and mounting flanges. We cannot find them in GSI, possibly they are somewhere not obvious in Edinburgh.

The strain relief on the detectors' side are still being manufactured.

 

We plan to test the detectors electrically from next week without moving the dolly. DR and OG to find a temporary mounting point for the manifold so that FEEs can be cooled in current configuration.

Attachment 1: 20230502_153410.jpg  2.592 MB  Uploaded Tue May 2 16:06:10 2023  | Hide | Hide all
20230502_153410.jpg
Attachment 2: 20230502_153503.jpg  2.132 MB  Uploaded Tue May 2 16:06:53 2023  | Hide | Hide all
20230502_153503.jpg
Attachment 3: 20230502_153509.jpg  2.334 MB  Uploaded Tue May 2 16:07:40 2023  | Hide | Hide all
20230502_153509.jpg
Attachment 4: 20230502_153511.jpg  2.458 MB  Uploaded Tue May 2 16:08:24 2023  | Hide | Hide all
20230502_153511.jpg
ELOG V3.1.4-unknown