The CARME chamber was closed and pushed back into position on the ring.
Prior to moving back onto the ring, the detectors were bias tested and the distance between the detectors was also checked using the motors. Bias test was performed before the detector movement tests and before moving the chamber back onto the ring.
Attached images shows the separation between the detectors when moved in togther. Separation is < 10 mm. Motors logs will be checked to place safety limits on the movement.
The chamber was pumped down. At 2 mbar the turbo was turned on, but the pressure would not decrease below 1e-2 mbar. The turbo was switched off and the pressure increased to 2 mbar. Isopropanol was sprayed on the wire seal causing an increase in the pressure. Leak on the wire seal. |