AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 417     Entry time: Thu Jul 13 00:12:45 2023
Author: JM, CB 
Subject: CARME closed 

The CARME chamber was closed and pushed back into position on the ring. 

Prior to moving back onto the ring, the detectors were bias tested and the distance between the detectors was also checked using the motors. Bias test was performed before the detector movement tests and before moving the chamber back onto the ring.  

Attached images shows the separation between the detectors when moved in togther. Separation is < 10 mm. Motors logs will be checked to place safety limits on the movement.

The chamber was pumped down. At 2 mbar the turbo was turned on, but the pressure would not decrease below 1e-2 mbar. The turbo was switched off and the pressure increased to 2 mbar. Isopropanol was sprayed on the wire seal causing an increase in the pressure. Leak on the wire seal. 

Attachment 1: Bias110723.png  85 kB  Uploaded Wed Jul 19 12:44:10 2023  | Hide | Hide all
Bias110723.png
Attachment 2: fullyin.jpg  1.671 MB  Uploaded Wed Jul 19 12:52:28 2023  | Hide | Hide all
fullyin.jpg
Attachment 3: fullyin-measured.jpg  1.339 MB  Uploaded Wed Jul 19 12:54:50 2023  | Hide | Hide all
fullyin-measured.jpg
ELOG V3.1.4-unknown