AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 431     Entry time: Thu Aug 10 07:51:43 2023
Author: JM 
Subject: Baking tent and heater testing 

09/08/23

Attached is the current pumpdown plot taken from grafana. 

I have started to re-work the baking tent in order to close gaps from its initial installation. The heaters work and were tested to a temperature of 50C. Testing is required to gauge the heater temperature required to heat the baking volume, we suspect the heaters will be several hundred degrees. 

11/08/23

Baking tent has been fully constructed again, see photos attached.  Some thermocouples have been re-positioned, new thermocouples positions are given in elog 433. GSI ion pump cable has been connected. Roughing pump on the outside of the berylium window has been connected and berylium window is at < 10 mbar. 

Attachment 1: current-pump-down.png  56 kB  Uploaded Thu Aug 10 08:56:22 2023  | Hide | Hide all
current-pump-down.png
Attachment 2: 20230812_120951.jpg  3.680 MB  Uploaded Sat Aug 12 12:45:22 2023  | Hide | Hide all
20230812_120951.jpg
Attachment 3: 20230812_120925.jpg  4.353 MB  Uploaded Sat Aug 12 12:45:44 2023  | Hide | Hide all
20230812_120925.jpg
Attachment 4: 20230811_152942.jpg  3.347 MB  Uploaded Sat Aug 12 12:46:13 2023  | Hide | Hide all
20230811_152942.jpg
Attachment 5: 20230811_152926.jpg  3.802 MB  Uploaded Sat Aug 12 12:46:35 2023  | Hide | Hide all
20230811_152926.jpg
Attachment 6: 20230811_152923.jpg  3.167 MB  Uploaded Sat Aug 12 12:47:09 2023  | Hide | Hide all
20230811_152923.jpg
Attachment 7: 20230811_152918.jpg  4.272 MB  Uploaded Sat Aug 12 12:47:36 2023  | Hide | Hide all
20230811_152918.jpg
Attachment 8: 20230811_152913.jpg  4.370 MB  Uploaded Sat Aug 12 12:48:07 2023  | Hide | Hide all
20230811_152913.jpg
ELOG V3.1.4-unknown