Subject: Leaky manifold and cable management 

Found two leaks in the welding of the manifolds, marked them in tape. Manifold to be repaired on Monday. Remember to re-install missing hoses, which are  in a bucket in the cave.

See attached how it is supposed to look like.

Left hand hose (inlet) was too short and was cut to dismount the manifold. Davide will obtain a new tube of the same type and mount it for us. NOTE THAT THE INLET connector (BLUE manifold) was leaking. Unclear if this was the hose or poor plumbing.

Installed cable management system that was never used during the last beamtime. Started to thread cables through it. There should be sufficient space to re-install the manifolds with the cable tray in place. If this is difficult, the tray is installed with zip ties only so altering position should be relativly straightforward. The mounting points of the outlet manifold on the CARME chamber can also be rotated around to give a bit more space.

Cleaned up some boxes and moved heaters and some empty boxes to the CRYRING roof.

Attachment 1: 20240112_111838.jpg  2.701 MB  | Hide | Hide all
20240112_111838.jpg
Attachment 2: 20240112_105936.jpg  2.898 MB  | Hide | Hide all
20240112_105936.jpg
Attachment 3: 20240113_183019.jpg  3.862 MB  Uploaded Sat Jan 13 17:32:49 2024  | Hide | Hide all
20240113_183019.jpg
ELOG V3.1.4-unknown