|
AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
|
CARME |
 |
|
Message ID: 48
Entry time: Tue Aug 31 18:34:41 2021
|
Author: |
CB RSS + DR OG |
Subject: |
CARME on Al stand |
|
|
Lifted CARME off the floor and mounted feet on sides. It was found impossible to put four bolts for each foot
due to alignment conflict. Three bolts were mounted per foot instead.
One of the mounting holes in CARME has been damaged and the thread has been ruined. Simple rethreading attempts
failed. Three good holes left - not an issue for now.
One of the shims between the feet and the chamber had to be modified in the workshop. Some feet were rather
difficult to mount, but in the end we succedeed.
CARME was then lifted on the Al frame and gently dropped. The crane remains in place overnight to prevent it
falling over given it is not anchored to the floor.
Front foot and back foot were also mounted.
Elbows at the back were mounted.
Currently considering whether to mount gate valves before or after lifting in place on YR09. Lift experts will
decide tomorrow what is the easiest procedure given constraints on the ring.
See other attachment and next entry for current status.
YR09 downstream will be cleared tomorrow morning. Lift will proceed tomorrow afternoon. |
|
|
|
|
|
|
|
|
|
|